	{"id":73611,"date":"2020-12-24T04:57:03","date_gmt":"2020-12-23T17:57:03","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballarat\/?p=73611"},"modified":"2020-12-24T08:02:59","modified_gmt":"2020-12-23T21:02:59","slug":"new-bus-interchange-set-for-station","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/","title":{"rendered":"New bus interchange set for station"},"content":{"rendered":"<p>TO cater for the projected increase in train services due to the Ballarat Line Upgrade project, works are set to begin on a new bus interchange at the station.<\/p>\n<p>While announcing BMD Constructions as contractor, Minister for Public Transport Ben Carroll said work on the new bus interchange will begin in January during the closure of the Ballarat Line and are due to finish mid next year.<\/p>\n<p>\u201cWe know the local community is keen to see the interchange built as soon as possible to reduce congestion on local streets and it\u2019s<\/p>\n<figure id=\"attachment_73615\" aria-describedby=\"caption-attachment-73615\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-73615\" src=\"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-content\/uploads\/sites\/9\/2020\/12\/Site-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-300x200.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-1024x683.jpg 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-768x512.jpg 768w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-1536x1024.jpg 1536w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-2048x1365.jpg 2048w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/Site-272x182.jpg 272w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-73615\" class=\"wp-caption-text\">Urban bus services in Ballarat will have a new stopping place beside platform two at Ballarat Station.<\/figcaption><\/figure>\n<p>great we are now closer to making it a reality,\u201d he said.<\/p>\n<p>\u201cWorking with BMD Constructions there will be 160 jobs provided here through the upgrade.<\/p>\n<p>\u201cThis is part of an ongoing process to bring more services to Ballarat\u2026 to ensure we can continue bringing the best of public transport to the Ballarat region and beyond.\u201d<\/p>\n<p>Aiming to provide 12 new spaces for suburban buses, the interchange was designed alongside local community members, heritage experts, engineers and architects and took into account the station\u2019s iconic heritage appeal.<\/p>\n<p>\u201cWe have had extensive community consultation\u2026 and the local community\u2019s involvement has helped to lead the design process,\u201d Mr Carroll said.<\/p>\n<p>\u201cWe\u2019ve also heard the community want better walking and access to the station so we will also be doing a new pedestrian walkway to the station\u2026 the idea is that it will be disability compliant.<\/p>\n<p>\u201cThis is a really great project and we are going to start work as soon as possible to capitalise on the shutdown of the Ballarat Line while we do our upgrades.\u201d<\/p>\n<p>From 28 December to 30 January, buses will replace trains along the Ballarat Line while final works are completed and from 31 January the new train timetable that includes 125 new services will come start.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TO cater for the projected increase in train services due to the Ballarat Line Upgrade project, works are set to begin on a new bus interchange at the station. While announcing BMD Constructions as contractor, Minister for Public Transport Ben Carroll said work on the new bus interchange will begin in January during the closure [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":164,"featured_media":73614,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-73611","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New bus interchange set for station - Ballarat Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New bus interchange set for station - Ballarat Times\" \/>\n<meta property=\"og:description\" content=\"TO cater for the projected increase in train services due to the Ballarat Line Upgrade project, works are set to begin on a new bus interchange at the station. While announcing BMD Constructions as contractor, Minister for Public Transport Ben Carroll said work on the new bus interchange will begin in January during the closure [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballarat Times\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-23T17:57:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-23T21:02:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ruby Staley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ruby Staley\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/\"},\"author\":{\"name\":\"Ruby Staley\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/1c39b3a145f39b0fcf908463ce6e578e\"},\"headline\":\"New bus interchange set for station\",\"datePublished\":\"2020-12-23T17:57:03+00:00\",\"dateModified\":\"2020-12-23T21:02:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/\"},\"wordCount\":328,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2020\\\/12\\\/New-Bus-scaled-e1608603515798.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/\",\"name\":\"New bus interchange set for station - Ballarat Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2020\\\/12\\\/New-Bus-scaled-e1608603515798.jpg\",\"datePublished\":\"2020-12-23T17:57:03+00:00\",\"dateModified\":\"2020-12-23T21:02:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2020\\\/12\\\/New-Bus-scaled-e1608603515798.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2020\\\/12\\\/New-Bus-scaled-e1608603515798.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Take off: V\\\/Line acting chief executive officer Gary Liddle, program director for Vic Track Steve Lupton, Member for Wendouree Juliana Addison, Minister for Transport Ben Carroll and Member for Buninyong Michaela Settle at the new bus interchange site. Photo: RUBY STALEY\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/new-bus-interchange-set-for-station\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New bus interchange set for station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"name\":\"Ballarat Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\",\"name\":\"Ballarat Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"width\":739,\"height\":98,\"caption\":\"Ballarat Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/1c39b3a145f39b0fcf908463ce6e578e\",\"name\":\"Ruby Staley\",\"sameAs\":[\"http:\\\/\\\/www.rubystaley.com\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/author\\\/ruby\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New bus interchange set for station - Ballarat Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/","og_locale":"en_US","og_type":"article","og_title":"New bus interchange set for station - Ballarat Times","og_description":"TO cater for the projected increase in train services due to the Ballarat Line Upgrade project, works are set to begin on a new bus interchange at the station. While announcing BMD Constructions as contractor, Minister for Public Transport Ben Carroll said work on the new bus interchange will begin in January during the closure [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/","og_site_name":"Ballarat Times","article_published_time":"2020-12-23T17:57:03+00:00","article_modified_time":"2020-12-23T21:02:59+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg","type":"image\/jpeg"}],"author":"Ruby Staley","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ruby Staley","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/"},"author":{"name":"Ruby Staley","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/1c39b3a145f39b0fcf908463ce6e578e"},"headline":"New bus interchange set for station","datePublished":"2020-12-23T17:57:03+00:00","dateModified":"2020-12-23T21:02:59+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/"},"wordCount":328,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/","name":"New bus interchange set for station - Ballarat Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg","datePublished":"2020-12-23T17:57:03+00:00","dateModified":"2020-12-23T21:02:59+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2020\/12\/New-Bus-scaled-e1608603515798.jpg","width":1000,"height":667,"caption":"Take off: V\/Line acting chief executive officer Gary Liddle, program director for Vic Track Steve Lupton, Member for Wendouree Juliana Addison, Minister for Transport Ben Carroll and Member for Buninyong Michaela Settle at the new bus interchange site. Photo: RUBY STALEY"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/new-bus-interchange-set-for-station\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/ballarat\/"},{"@type":"ListItem","position":2,"name":"New bus interchange set for station"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","name":"Ballarat Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballarat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization","name":"Ballarat Times","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","width":739,"height":98,"caption":"Ballarat Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/1c39b3a145f39b0fcf908463ce6e578e","name":"Ruby Staley","sameAs":["http:\/\/www.rubystaley.com"],"url":"https:\/\/timesnewsgroup.com.au\/ballarat\/author\/ruby\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/73611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/users\/164"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/comments?post=73611"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/73611\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media\/73614"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media?parent=73611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/categories?post=73611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/tags?post=73611"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/post_folder?post=73611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}