	{"id":79856,"date":"2021-10-07T04:57:04","date_gmt":"2021-10-06T17:57:04","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballarat\/?p=79856"},"modified":"2021-10-05T14:49:16","modified_gmt":"2021-10-05T03:49:16","slug":"next-step-for-bridge-mall-upgrade","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/","title":{"rendered":"Next step for Bridge Mall upgrade"},"content":{"rendered":"<p>THE City of Ballarat\u2019s Bridge Mall Revitalisation Project has progressed, moving into a design development phase.<\/p>\n<p>As part of the new stage of works, architecture firm Hassell will collaborate with community representatives to get their input for final designs.<\/p>\n<p>Mayor Cr Daniel Moloney said functional elements of the precinct\u2019s design are complete and include \u201cslow-moving, one-way traffic\u201d.<\/p>\n<p>\u201cHowever, we need our community to contribute to how this much-loved area should look, feel and operate,\u201d he said.<\/p>\n<p>Sessions between community representatives and architects will be conducted during the design development phase with the aim of what\u2019s being described as a comfortable, inviting, and vibrant look and feel for the area.<\/p>\n<p>\u201cBridge Mall belongs to everyone. We want people back using and enjoying the spaces, exploring the laneways, and spending time,\u201d Cr Moloney said.<\/p>\n<p>\u201cWe want people shopping and eating there. We want green recreation spaces, and activity both day and night.<\/p>\n<p>\u201cBut to do this properly we need the visionary voices of our community directly helping to shape the future of the design.\u201d<\/p>\n<p>The upgrades form part of the municipality\u2019s $15 million Bakery Hill Urban Renewal Plan adopted by council in late 2019.<\/p>\n<p>In Bridge Mall, the plan seeks to restore the precinct to an active city space following retail decline, poor transport connections, physical access difficulties and changing shopping trends, according to the City.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE City of Ballarat\u2019s Bridge Mall Revitalisation Project has progressed, moving into a design development phase. As part of the new stage of works, architecture firm Hassell will collaborate with community representatives to get their input for final designs. Mayor Cr Daniel Moloney said functional elements of the precinct\u2019s design are complete and include \u201cslow-moving, [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":184,"featured_media":79859,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-79856","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Next step for Bridge Mall upgrade - Ballarat Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Next step for Bridge Mall upgrade - Ballarat Times\" \/>\n<meta property=\"og:description\" content=\"THE City of Ballarat\u2019s Bridge Mall Revitalisation Project has progressed, moving into a design development phase. As part of the new stage of works, architecture firm Hassell will collaborate with community representatives to get their input for final designs. Mayor Cr Daniel Moloney said functional elements of the precinct\u2019s design are complete and include \u201cslow-moving, [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballarat Times\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-06T17:57:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Martin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Martin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/\"},\"author\":{\"name\":\"Katie Martin\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/9ca77e473680910b9755fd1276b78e64\"},\"headline\":\"Next step for Bridge Mall upgrade\",\"datePublished\":\"2021-10-06T17:57:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/\"},\"wordCount\":232,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/\",\"name\":\"Next step for Bridge Mall upgrade - Ballarat Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg\",\"datePublished\":\"2021-10-06T17:57:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg\",\"width\":1000,\"height\":563,\"caption\":\"Plans progress: The Bridge Mall Revitalisation Project will now head into a design development phase with community representatives, architects and designers. Photo: SUPPLIED\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/next-step-for-bridge-mall-upgrade\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Next step for Bridge Mall upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"name\":\"Ballarat Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\",\"name\":\"Ballarat Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"width\":739,\"height\":98,\"caption\":\"Ballarat Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/9ca77e473680910b9755fd1276b78e64\",\"name\":\"Katie Martin\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/author\\\/katie\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Next step for Bridge Mall upgrade - Ballarat Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/","og_locale":"en_US","og_type":"article","og_title":"Next step for Bridge Mall upgrade - Ballarat Times","og_description":"THE City of Ballarat\u2019s Bridge Mall Revitalisation Project has progressed, moving into a design development phase. As part of the new stage of works, architecture firm Hassell will collaborate with community representatives to get their input for final designs. Mayor Cr Daniel Moloney said functional elements of the precinct\u2019s design are complete and include \u201cslow-moving, [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/","og_site_name":"Ballarat Times","article_published_time":"2021-10-06T17:57:04+00:00","og_image":[{"width":1000,"height":563,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg","type":"image\/jpeg"}],"author":"Katie Martin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katie Martin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/"},"author":{"name":"Katie Martin","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/9ca77e473680910b9755fd1276b78e64"},"headline":"Next step for Bridge Mall upgrade","datePublished":"2021-10-06T17:57:04+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/"},"wordCount":232,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/","name":"Next step for Bridge Mall upgrade - Ballarat Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg","datePublished":"2021-10-06T17:57:04+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/Bridge-Mall-hero-image-scaled-e1633405707576.jpg","width":1000,"height":563,"caption":"Plans progress: The Bridge Mall Revitalisation Project will now head into a design development phase with community representatives, architects and designers. Photo: SUPPLIED"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/next-step-for-bridge-mall-upgrade\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/ballarat\/"},{"@type":"ListItem","position":2,"name":"Next step for Bridge Mall upgrade"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","name":"Ballarat Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballarat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization","name":"Ballarat Times","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","width":739,"height":98,"caption":"Ballarat Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/9ca77e473680910b9755fd1276b78e64","name":"Katie Martin","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/author\/katie\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/79856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/users\/184"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/comments?post=79856"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/79856\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media\/79859"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media?parent=79856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/categories?post=79856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/tags?post=79856"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/post_folder?post=79856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}