	{"id":81122,"date":"2021-12-02T04:55:52","date_gmt":"2021-12-01T17:55:52","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballarat\/?p=81122"},"modified":"2021-12-01T22:21:41","modified_gmt":"2021-12-01T11:21:41","slug":"final-power-line-route-confirmed","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/","title":{"rendered":"Final power line route confirmed"},"content":{"rendered":"<p>THE pathway for the Western Victoria Transmission Network Project has been announced by AusNet Services.<\/p>\n<p>A statement released by the builder said over 200 landowners would be affected along the 199-kilometre route that\u2019s set to run from Bulgana near Ararat to Sydenham in Melbourne\u2019s west.<\/p>\n<p>The 220-kilovolt power line will enter the region at Waubra before running east through Mount Boulton, Glendonald and Allendale and then heading either north or south of Hepburn Lagoon before arrived at a planned substation at Newlyn North.<\/p>\n<p>From there the line will convert to a 500-kilovolt service, turn south towards Dean and then head east at Mollongghip.<\/p>\n<p>&#8220;Sharing the proposed route now will ensure much-needed clarity for around 220 of the 465 landholders that were within the single corridor,\u201d said Stephanie McGregor, WVTNP executive project director.<\/p>\n<p>\u201cThey now have the confirmation that their property is not on the proposed route.\u201d<\/p>\n<p>As part of the confirmation of the route, an AusNet Services statement said it had investigated taking the line underground, however that presented challenges.<\/p>\n<p>\u201cThe investigation has found that undergrounding the transmission line would require significant soil and vegetation removal and disturbance of Aboriginal cultural heritage, would limit opportunities for future renewable development, not meet the technical availability and reliability requirements of the electricity system, and cost approximately 16 times more,\u201d the statement said.<\/p>\n<p>\u201cAs a result, overhead construction has been recommended by the investigation.\u201d<\/p>\n<p>Stop AusNet\u2019s Towers Campaign subsequently released a statement critical of the decision and the process. They also signalled their next step.<\/p>\n<p>\u201cAusNet have not listened or acted upon the vast concerns brought to them by the community and businesses,\u201d said chair Emma Muir.<\/p>\n<p>\u201cAusNet have not undertaken comprehensive EES [environment effects statement] studies across all areas as they claim and this announcement is premature.<\/p>\n<p>\u201cWe are taking legal action to fight AusNet and AEMO. This project must be reassessed and put underground.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE pathway for the Western Victoria Transmission Network Project has been announced by AusNet Services. A statement released by the builder said over 200 landowners would be affected along the 199-kilometre route that\u2019s set to run from Bulgana near Ararat to Sydenham in Melbourne\u2019s west. The 220-kilovolt power line will enter the region at Waubra [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":141,"featured_media":81123,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-81122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Final power line route confirmed - Ballarat Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Final power line route confirmed - Ballarat Times\" \/>\n<meta property=\"og:description\" content=\"THE pathway for the Western Victoria Transmission Network Project has been announced by AusNet Services. A statement released by the builder said over 200 landowners would be affected along the 199-kilometre route that\u2019s set to run from Bulgana near Ararat to Sydenham in Melbourne\u2019s west. The 220-kilovolt power line will enter the region at Waubra [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballarat Times\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/alistairfinlayjournalist\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-01T17:55:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"750\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alistair Finlay\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alistair Finlay\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/\"},\"author\":{\"name\":\"Alistair Finlay\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/9bf999ff27982396123a6d7a9abe115b\"},\"headline\":\"Final power line route confirmed\",\"datePublished\":\"2021-12-01T17:55:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/\"},\"wordCount\":317,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/12\\\/IMG_6143-scaled-e1638357678613.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/\",\"name\":\"Final power line route confirmed - Ballarat Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/12\\\/IMG_6143-scaled-e1638357678613.jpg\",\"datePublished\":\"2021-12-01T17:55:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/12\\\/IMG_6143-scaled-e1638357678613.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/12\\\/IMG_6143-scaled-e1638357678613.jpg\",\"width\":1000,\"height\":750,\"caption\":\"Sign of the times: Some landowners along the Western Victoria Transmission Network Project route are opposed to the plans. Photo: ALISTAIR FINLAY\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/final-power-line-route-confirmed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Final power line route confirmed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"name\":\"Ballarat Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\",\"name\":\"Ballarat Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"width\":739,\"height\":98,\"caption\":\"Ballarat Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/9bf999ff27982396123a6d7a9abe115b\",\"name\":\"Alistair Finlay\",\"description\":\"Editor at the Ballarat Times News Group. Once at Westlock News, The Advocate, and the Latrobe Valley Express. Oilers fan. Email: alistair@timesnewsgroup.com.au Facebook: @alistairfinlayjournalist twitter: @alistairfinlay_ Instagram: @alistairfinlayeditor\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/alistairfinlayjournalist\\\/\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/author\\\/alistair\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Final power line route confirmed - Ballarat Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/","og_locale":"en_US","og_type":"article","og_title":"Final power line route confirmed - Ballarat Times","og_description":"THE pathway for the Western Victoria Transmission Network Project has been announced by AusNet Services. A statement released by the builder said over 200 landowners would be affected along the 199-kilometre route that\u2019s set to run from Bulgana near Ararat to Sydenham in Melbourne\u2019s west. The 220-kilovolt power line will enter the region at Waubra [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/","og_site_name":"Ballarat Times","article_author":"https:\/\/www.facebook.com\/alistairfinlayjournalist\/","article_published_time":"2021-12-01T17:55:52+00:00","og_image":[{"width":1000,"height":750,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg","type":"image\/jpeg"}],"author":"Alistair Finlay","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alistair Finlay","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/"},"author":{"name":"Alistair Finlay","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/9bf999ff27982396123a6d7a9abe115b"},"headline":"Final power line route confirmed","datePublished":"2021-12-01T17:55:52+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/"},"wordCount":317,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/","name":"Final power line route confirmed - Ballarat Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg","datePublished":"2021-12-01T17:55:52+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/12\/IMG_6143-scaled-e1638357678613.jpg","width":1000,"height":750,"caption":"Sign of the times: Some landowners along the Western Victoria Transmission Network Project route are opposed to the plans. Photo: ALISTAIR FINLAY"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/final-power-line-route-confirmed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/ballarat\/"},{"@type":"ListItem","position":2,"name":"Final power line route confirmed"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","name":"Ballarat Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballarat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization","name":"Ballarat Times","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","width":739,"height":98,"caption":"Ballarat Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/9bf999ff27982396123a6d7a9abe115b","name":"Alistair Finlay","description":"Editor at the Ballarat Times News Group. Once at Westlock News, The Advocate, and the Latrobe Valley Express. Oilers fan. Email: alistair@timesnewsgroup.com.au Facebook: @alistairfinlayjournalist twitter: @alistairfinlay_ Instagram: @alistairfinlayeditor","sameAs":["https:\/\/www.facebook.com\/alistairfinlayjournalist\/"],"url":"https:\/\/timesnewsgroup.com.au\/ballarat\/author\/alistair\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/81122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/users\/141"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/comments?post=81122"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/81122\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media\/81123"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media?parent=81122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/categories?post=81122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/tags?post=81122"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/post_folder?post=81122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}