	{"id":85671,"date":"2022-07-05T10:24:03","date_gmt":"2022-07-04T23:24:03","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballarat\/?p=85671"},"modified":"2022-07-05T10:24:03","modified_gmt":"2022-07-04T23:24:03","slug":"bike-path-to-connect-suburbs","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/","title":{"rendered":"Bike path to connect suburbs"},"content":{"rendered":"<p>A NEW shared cycling and pedestrian track is on the way for the city\u2019s north-western suburbs.<\/p>\n<p>Linking Wendouree and Mitchell Park, the almost three-kilometre concrete path will run along Learmonth Road.<\/p>\n<p>The project is set to cost $915,000, and City of Ballarat CEO Evan King said it will make the area a safer to enjoy a walk or ride.<\/p>\n<p>\u201cThe shared pedestrian and cycling path aims to improve safety for cyclists in Ballarat, by creating a separate cycling route along the railway corridor and key routes,\u201d he said.<\/p>\n<p>\u201cThis will mean cyclists can avoid using major arterial roads and not compete with vehicles.<\/p>\n<p>\u201cThis new safe, separated path means it is suitable for and safe for both inexperienced riders and school children as well as confident commuters.<\/p>\n<p>\u201cIt is critical to maintaining the lifestyle and accessibility so valued by our Ballarat community.\u201d<\/p>\n<p>The path will begin at Waringa Drive in Mitchell Park and end near Central Highlands Water\u2019s offices near Wendouree Station.<\/p>\n<p>At 2.5 metres wide, the track will include a pedestrian refuge near the start point.<\/p>\n<p>Funded by Regional Roads Victoria, the project is part of the $9.3 million Ballarat Safer Cycling Connections program that also includes the Sturt Street shared path and intersection upgrades, and the Wendouree to Ballarat Railway Corridor.<\/p>\n<p>The path is part of the City\u2019s Bicycle Action Plan 2017-25, which Mr King said is providing the ongoing framework for Ballarat\u2019s arterial cycling circuits.<\/p>\n<p>\u201cThe plan prioritises delivery of safe and continuous routes, which will have the greatest impact on increasing the number of everyday cyclists, in preference to supporting individual projects across the city,\u201d he said.<\/p>\n<p>It is expected the Learmonth path will comprise a future bicycle and pedestrian link to Miner\u2019s Rest.<\/p>\n<p>With tender applications closed on Monday, 27 June, works are expected to begin in August.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A NEW shared cycling and pedestrian track is on the way for the city\u2019s north-western suburbs. Linking Wendouree and Mitchell Park, the almost three-kilometre concrete path will run along Learmonth Road. The project is set to cost $915,000, and City of Ballarat CEO Evan King said it will make the area a safer to enjoy [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":198,"featured_media":85672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-85671","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bike path to connect suburbs - Ballarat Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bike path to connect suburbs - Ballarat Times\" \/>\n<meta property=\"og:description\" content=\"A NEW shared cycling and pedestrian track is on the way for the city\u2019s north-western suburbs. Linking Wendouree and Mitchell Park, the almost three-kilometre concrete path will run along Learmonth Road. The project is set to cost $915,000, and City of Ballarat CEO Evan King said it will make the area a safer to enjoy [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballarat Times\" \/>\n<meta property=\"article:published_time\" content=\"2022-07-04T23:24:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tim Bottams\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tim Bottams\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/\"},\"author\":{\"name\":\"Tim Bottams\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/ef2cb0351151f52788a4263e854228dc\"},\"headline\":\"Bike path to connect suburbs\",\"datePublished\":\"2022-07-04T23:24:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/\"},\"wordCount\":309,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/07\\\/IMG_5738-scaled-e1656977027272.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/\",\"name\":\"Bike path to connect suburbs - Ballarat Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/07\\\/IMG_5738-scaled-e1656977027272.jpg\",\"datePublished\":\"2022-07-04T23:24:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/07\\\/IMG_5738-scaled-e1656977027272.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/07\\\/IMG_5738-scaled-e1656977027272.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Sharing the road: The Learmonth Street shared bike and pedestrian path will start at Waringa Drive and end near the Gillies Street North intersection. Photo: TIM BOTTAMS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/bike-path-to-connect-suburbs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bike path to connect suburbs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"name\":\"Ballarat Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\",\"name\":\"Ballarat Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"width\":739,\"height\":98,\"caption\":\"Ballarat Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/ef2cb0351151f52788a4263e854228dc\",\"name\":\"Tim Bottams\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/author\\\/timbottams\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bike path to connect suburbs - Ballarat Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/","og_locale":"en_US","og_type":"article","og_title":"Bike path to connect suburbs - Ballarat Times","og_description":"A NEW shared cycling and pedestrian track is on the way for the city\u2019s north-western suburbs. Linking Wendouree and Mitchell Park, the almost three-kilometre concrete path will run along Learmonth Road. The project is set to cost $915,000, and City of Ballarat CEO Evan King said it will make the area a safer to enjoy [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/","og_site_name":"Ballarat Times","article_published_time":"2022-07-04T23:24:03+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg","type":"image\/jpeg"}],"author":"Tim Bottams","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tim Bottams","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/"},"author":{"name":"Tim Bottams","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/ef2cb0351151f52788a4263e854228dc"},"headline":"Bike path to connect suburbs","datePublished":"2022-07-04T23:24:03+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/"},"wordCount":309,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/","name":"Bike path to connect suburbs - Ballarat Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg","datePublished":"2022-07-04T23:24:03+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/07\/IMG_5738-scaled-e1656977027272.jpg","width":1000,"height":667,"caption":"Sharing the road: The Learmonth Street shared bike and pedestrian path will start at Waringa Drive and end near the Gillies Street North intersection. Photo: TIM BOTTAMS"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/bike-path-to-connect-suburbs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/ballarat\/"},{"@type":"ListItem","position":2,"name":"Bike path to connect suburbs"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","name":"Ballarat Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballarat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization","name":"Ballarat Times","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","width":739,"height":98,"caption":"Ballarat Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/ef2cb0351151f52788a4263e854228dc","name":"Tim Bottams","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/author\/timbottams\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/85671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/users\/198"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/comments?post=85671"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/85671\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media\/85672"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media?parent=85671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/categories?post=85671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/tags?post=85671"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/post_folder?post=85671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}