	{"id":86382,"date":"2022-08-04T04:58:22","date_gmt":"2022-08-03T18:58:22","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballarat\/?p=86382"},"modified":"2022-08-04T09:58:21","modified_gmt":"2022-08-03T23:58:21","slug":"designs-released-for-mall-overhaul","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/","title":{"rendered":"Designs released for Mall overhaul"},"content":{"rendered":"<p>THE final designs have been revealed for Bridge Mall\u2019s fifteen-million-dollar redevelopment.<\/p>\n<p>Works include the final plan for reintroduction of traffic to Bridge Street, a modified children\u2019s play space, and landscaping.<\/p>\n<p>With funds allocated for the project in 2019, City of Ballarat mayor Cr Daniel Moloney said the works aims to deliver a new take on what came before.<\/p>\n<p>\u201cWe\u2019re really now looking to tinker with the treatments to make sure they reflect the character of Ballarat, that it\u2019s a warm, inviting area from Sturt Street into a new Bridge Street,\u201d he said.<\/p>\n<p>\u201cOne of the things I love the most is reusing some of the bluestone out of the sail yards. To have them down as key features as a car drives over them not only alerts the cars to pedestrians, but the pedestrian will hear the noise as well\u2026 and yet they still look beautiful and it harkens back to Ballarat\u2019s past.<\/p>\n<p>\u201cIt does the visual, the auditory, and that whole sense of being in Ballarat all through the choice of materials so these things are important.\u201d<\/p>\n<p>The one-way traffic will be directed from Sturt Street with additional lighting and barriers as well as a window showcasing the Yarrowee River underfoot.<\/p>\n<figure id=\"attachment_86387\" aria-describedby=\"caption-attachment-86387\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-86387\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/Sturt-Street-entry-into-Bridge-Street-scaled-e1659425251782-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/Sturt-Street-entry-into-Bridge-Street-scaled-e1659425251782-300x169.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/Sturt-Street-entry-into-Bridge-Street-scaled-e1659425251782-768x432.jpg 768w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/Sturt-Street-entry-into-Bridge-Street-scaled-e1659425251782.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-86387\" class=\"wp-caption-text\">The reconfigured entry from Sturt to Bridge streets will include the closing of southern flow traffic along Grenville Street. Image: SUPPLIED<\/figcaption><\/figure>\n<p>Early construction is expected to begin at Christmas followed by major works in early 2023 planned to last 12 to 18 months.<\/p>\n<p>It is expected more than $17 million will be required to achieve the project\u2019s full scope.<\/p>\n<p>Global architectural firm Hassell were chosen to design the project, and principal Mark Haycox said the final plans have been a collaborative process.<\/p>\n<p>\u201cIt\u2019s not a transaction where the client hands a brief and we go and do it. It\u2019s actually a hand-in-glove and very intricate process,\u201d he said.<\/p>\n<p>\u201cCollectively, that consultation, that engagement with the state, with the traders, the community, all of the inputs\u2026 has really provided an in-depth amount of knowledge and experience.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE final designs have been revealed for Bridge Mall\u2019s fifteen-million-dollar redevelopment. Works include the final plan for reintroduction of traffic to Bridge Street, a modified children\u2019s play space, and landscaping. With funds allocated for the project in 2019, City of Ballarat mayor Cr Daniel Moloney said the works aims to deliver a new take on [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":198,"featured_media":86384,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-86382","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Designs released for Mall overhaul - Ballarat Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Designs released for Mall overhaul - Ballarat Times\" \/>\n<meta property=\"og:description\" content=\"THE final designs have been revealed for Bridge Mall\u2019s fifteen-million-dollar redevelopment. Works include the final plan for reintroduction of traffic to Bridge Street, a modified children\u2019s play space, and landscaping. With funds allocated for the project in 2019, City of Ballarat mayor Cr Daniel Moloney said the works aims to deliver a new take on [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballarat Times\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-03T18:58:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-03T23:58:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Tim Bottams\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tim Bottams\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/\"},\"author\":{\"name\":\"Tim Bottams\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/ef2cb0351151f52788a4263e854228dc\"},\"headline\":\"Designs released for Mall overhaul\",\"datePublished\":\"2022-08-03T18:58:22+00:00\",\"dateModified\":\"2022-08-03T23:58:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/\"},\"wordCount\":352,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/08\\\/IMG_7891-scaled-e1659425092179.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/\",\"name\":\"Designs released for Mall overhaul - Ballarat Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/08\\\/IMG_7891-scaled-e1659425092179.jpg\",\"datePublished\":\"2022-08-03T18:58:22+00:00\",\"dateModified\":\"2022-08-03T23:58:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/08\\\/IMG_7891-scaled-e1659425092179.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2022\\\/08\\\/IMG_7891-scaled-e1659425092179.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Towards the future: Bridge Mall Traders Association vice-president Shane Donnithorne, City of Ballarat mayor Cr Daniel Moloney, Hassell principal Mark Haycox and deputy-mayor Cr Amy Johnson. Photo: TIM BOTTAMS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/news\\\/designs-released-for-mall-overhaul\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Designs released for Mall overhaul\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"name\":\"Ballarat Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#organization\",\"name\":\"Ballarat Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/9\\\/2021\\\/10\\\/BALT.png\",\"width\":739,\"height\":98,\"caption\":\"Ballarat Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/#\\\/schema\\\/person\\\/ef2cb0351151f52788a4263e854228dc\",\"name\":\"Tim Bottams\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballarat\\\/author\\\/timbottams\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Designs released for Mall overhaul - Ballarat Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/","og_locale":"en_US","og_type":"article","og_title":"Designs released for Mall overhaul - Ballarat Times","og_description":"THE final designs have been revealed for Bridge Mall\u2019s fifteen-million-dollar redevelopment. Works include the final plan for reintroduction of traffic to Bridge Street, a modified children\u2019s play space, and landscaping. With funds allocated for the project in 2019, City of Ballarat mayor Cr Daniel Moloney said the works aims to deliver a new take on [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/","og_site_name":"Ballarat Times","article_published_time":"2022-08-03T18:58:22+00:00","article_modified_time":"2022-08-03T23:58:21+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg","type":"image\/jpeg"}],"author":"Tim Bottams","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tim Bottams","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/"},"author":{"name":"Tim Bottams","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/ef2cb0351151f52788a4263e854228dc"},"headline":"Designs released for Mall overhaul","datePublished":"2022-08-03T18:58:22+00:00","dateModified":"2022-08-03T23:58:21+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/"},"wordCount":352,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/","name":"Designs released for Mall overhaul - Ballarat Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg","datePublished":"2022-08-03T18:58:22+00:00","dateModified":"2022-08-03T23:58:21+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2022\/08\/IMG_7891-scaled-e1659425092179.jpg","width":1000,"height":667,"caption":"Towards the future: Bridge Mall Traders Association vice-president Shane Donnithorne, City of Ballarat mayor Cr Daniel Moloney, Hassell principal Mark Haycox and deputy-mayor Cr Amy Johnson. Photo: TIM BOTTAMS"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/news\/designs-released-for-mall-overhaul\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/ballarat\/"},{"@type":"ListItem","position":2,"name":"Designs released for Mall overhaul"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","name":"Ballarat Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballarat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#organization","name":"Ballarat Times","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/9\/2021\/10\/BALT.png","width":739,"height":98,"caption":"Ballarat Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballarat\/#\/schema\/person\/ef2cb0351151f52788a4263e854228dc","name":"Tim Bottams","url":"https:\/\/timesnewsgroup.com.au\/ballarat\/author\/timbottams\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/86382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/users\/198"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/comments?post=86382"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/posts\/86382\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media\/86384"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/media?parent=86382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/categories?post=86382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/tags?post=86382"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballarat\/wp-json\/wp\/v2\/post_folder?post=86382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}