	{"id":114289,"date":"2026-04-07T04:00:00","date_gmt":"2026-04-06T18:00:00","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/?p=114289"},"modified":"2026-04-01T23:35:46","modified_gmt":"2026-04-01T12:35:46","slug":"byron-bay-drainage-upgrade-continues-after-march-flooding","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/","title":{"rendered":"Byron Bay drainage upgrade continues after March flooding"},"content":{"rendered":"<p>WORK on the Byron Bay drainage upgrade is continuing, after flash flooding hit the town centre as recently as March.<\/p>\n<p>Heavy rain caused widespread flooding across the Byron Shire, with parts of Byron Bay inundated as construction continues on a major upgrade to the drainage network.<\/p>\n<p>Byron Shire Council manager of assets and major projects Christopher Soulsby said the works were designed to reduce that type of flooding once complete.<\/p>\n<p>\u201cThis is exactly the type of flooding that the Byron Bay Drainage Upgrade is trying to minimise once all of the work is done and the drainage system is fully connected,\u201d he said.<\/p>\n<p>\u201cForty culverts have now been installed from the rail corridor into Jonson Street, seeing a solid increase in drainage capacity.\u201d<\/p>\n<p>Soulsby said recent work had also included decommissioning the Rotary clocktower, which will be rebuilt later this year, and completing watermain relocation.<\/p>\n<p>\u201cOver the last month contractors have also decommissioned the Rotary clocktower which will be reconstructed later this year. And watermain relocation has now been completed,\u201d he said.<\/p>\n<p>Contractors will pause work over the Easter long weekend before returning to site on Tuesday.<\/p>\n<p>The South Lawson Street car park will reopen and pedestrian access near the laneway between Guzman Y Gomez and Byron Hot Bread Kitchen will be restored ahead of the holiday period.<\/p>\n<p>Work will continue in April, with construction extending further south along Jonson Street to upgrade drainage and the eastern footpath.<\/p>\n<p>\u201cWe hope everyone has a great Easter long weekend, and people hop down to the Byron Bay town centre businesses for great food, entertainment and shopping,\u201d Soulsby said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WORK on the Byron Bay drainage upgrade is continuing, after flash flooding hit the town centre as recently as March. Heavy rain caused widespread flooding across the Byron Shire, with parts of Byron Bay inundated as construction continues on a major upgrade to the drainage network. Byron Shire Council manager of assets and major projects [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":156,"featured_media":114290,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-114289","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Byron Bay drainage upgrade continues after March flooding - Ballina Times<\/title>\n<meta name=\"description\" content=\"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Byron Bay drainage upgrade continues after March flooding - Ballina Times\" \/>\n<meta property=\"og:description\" content=\"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/\" \/>\n<meta property=\"og:site_name\" content=\"Ballina Times\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-06T18:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Times News Group\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Times News Group\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/\"},\"author\":{\"name\":\"Times News Group\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#\\\/schema\\\/person\\\/c458b1ff60365992982bb7683264fe4b\"},\"headline\":\"Byron Bay drainage upgrade continues after March flooding\",\"datePublished\":\"2026-04-06T18:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/\"},\"wordCount\":274,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2026\\\/04\\\/1-apr-tng-49.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/\",\"name\":\"Byron Bay drainage upgrade continues after March flooding - Ballina Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2026\\\/04\\\/1-apr-tng-49.jpg\",\"datePublished\":\"2026-04-06T18:00:00+00:00\",\"description\":\"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.\",\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/news\\\/byron-bay-drainage-upgrade-continues-after-march-flooding\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2026\\\/04\\\/1-apr-tng-49.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2026\\\/04\\\/1-apr-tng-49.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Cars underwater in Deacon Street in Bangalow on Friday 13th. Photo: MULLUMBIMBY NSW SES\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/\",\"name\":\"Ballina Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#organization\",\"name\":\"Ballina Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2024\\\/07\\\/BallinaTimes.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/31\\\/2024\\\/07\\\/BallinaTimes.png\",\"width\":697,\"height\":98,\"caption\":\"Ballina Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/#\\\/schema\\\/person\\\/c458b1ff60365992982bb7683264fe4b\",\"name\":\"Times News Group\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g\",\"caption\":\"Times News Group\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/ballinatimes\\\/author\\\/timesnewsgroup\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Byron Bay drainage upgrade continues after March flooding - Ballina Times","description":"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/","og_locale":"en_US","og_type":"article","og_title":"Byron Bay drainage upgrade continues after March flooding - Ballina Times","og_description":"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.","og_url":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/","og_site_name":"Ballina Times","article_published_time":"2026-04-06T18:00:00+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg","type":"image\/jpeg"}],"author":"Times News Group","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Times News Group","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/"},"author":{"name":"Times News Group","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#\/schema\/person\/c458b1ff60365992982bb7683264fe4b"},"headline":"Byron Bay drainage upgrade continues after March flooding","datePublished":"2026-04-06T18:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/"},"wordCount":274,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/","url":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/","name":"Byron Bay drainage upgrade continues after March flooding - Ballina Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg","datePublished":"2026-04-06T18:00:00+00:00","description":"Work continues on the Byron Bay drainage upgrade to reduce flash flooding. See the latest project updates and Easter access changes.","inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/news\/byron-bay-drainage-upgrade-continues-after-march-flooding\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2026\/04\/1-apr-tng-49.jpg","width":1200,"height":630,"caption":"Cars underwater in Deacon Street in Bangalow on Friday 13th. Photo: MULLUMBIMBY NSW SES"},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/","name":"Ballina Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#organization","name":"Ballina Times","url":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2024\/07\/BallinaTimes.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/31\/2024\/07\/BallinaTimes.png","width":697,"height":98,"caption":"Ballina Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/#\/schema\/person\/c458b1ff60365992982bb7683264fe4b","name":"Times News Group","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cc82b54c1af02d71dab25589cd4c3d8b8bd2eb3e8e1ec22262f96ed18e6937dc?s=96&d=mm&r=g","caption":"Times News Group"},"url":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/author\/timesnewsgroup\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/posts\/114289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/users\/156"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/comments?post=114289"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/posts\/114289\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/media\/114290"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/media?parent=114289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/categories?post=114289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/tags?post=114289"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/ballinatimes\/wp-json\/wp\/v2\/post_folder?post=114289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}