	{"id":117855,"date":"2026-03-19T04:00:00","date_gmt":"2026-03-18T17:00:00","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?p=117855"},"modified":"2026-04-07T20:30:54","modified_gmt":"2026-04-07T10:30:54","slug":"final-plans-released-for-st-leonards-pier-rebuild","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/","title":{"rendered":"Final plans released for St Leonards Pier rebuild"},"content":{"rendered":"<p>The final design for the St Leonards Pier rebuild was released on Tuesday this week.<\/p>\n<p>While the pier&#8217;s larger footprint and revised layout were confirmed last year, the final design introduces a series of external refinements shaped by community feedback.<\/p>\n<p>These include curved and bench seating positioned to face the bay, wheelchair-accessible fishing platforms and expanded deck space near Sirens kiosk and the pier&#8217;s entrance to enhance its social use.<\/p>\n<p>A low landing will provide improved access for boaters, divers and snorkellers, while fishing rod holders and interpretive signage highlighting maritime history and marine life have also been added.<\/p>\n<p>More than 200 submissions were received during the final phase of community consultation on the project, which ran between October and November last year.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_30038\" aria-describedby=\"caption-attachment-30038\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-30038 \" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/StLeonardsPier_rende_23805.jpg\" alt=\"\" width=\"600\" height=\"458\" \/><figcaption id=\"caption-attachment-30038\" class=\"wp-caption-text\">An artist&#8217;s impression of the new-look St Leonards pier. Photo: Supplied.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Minister for Ports and Freight Melissa Horne said the design aimed to improve the pier&#8217;s access and usability.<\/p>\n<p>&#8220;We listened to community feedback and developed a new pier design that protects local heritage while creating a contemporary space for the community to gather, fish, learn and connect with the bay,&#8221; Horne said.<\/p>\n<p>The new pier&#8217;s alignment has been informed by technical and heritage assessments, with the structure offset from the existing pier to avoid nearby shipwrecks and archaeological material.<\/p>\n<p>The finalised design does not include any changes to the existing breakwall, an issue consistently raised by the community throughout consultation.<\/p>\n<p>Some locals have argued the deteriorating structure should be repaired or reinforced alongside the pier rebuild to improve shelter and safety for vessels during storms.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_30038\" aria-describedby=\"caption-attachment-30038\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-30038 size-large\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/StLeonardsPier_rende_23849.jpg\" alt=\"\" width=\"600\" height=\"802\" \/><figcaption id=\"caption-attachment-30038\" class=\"wp-caption-text\">The final design for the project includes an expanded deck space near Sirens kiosk and the pier\u2019s entrance to enhance its social use. Photo: Supplied.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Questions about the condition of the breakwall, its potential impact on the new pier and these community concerns were put to the Victorian government but were not addressed.<\/p>\n<p>Bellarine MP Alison Marchant said the rebuild was about &#8220;more than infrastructure&#8221;.<\/p>\n<p>&#8220;St Leonards Pier plays a significant role in the local community, which is why we are investing in this upgrade to rebuild this much-loved pier,&#8221; she said.<\/p>\n<p>&#8220;It&#8217;s about creating a safe, inclusive and vibrant community place that locals and visitors will enjoy for generations to come.<\/p>\n<p>&#8220;We thank the St Leonards community for their important feedback to help shape this project and are working hard to make sure this landmark can be enjoyed for years to come.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The final design for the St Leonards Pier rebuild was released on Tuesday this week. While the pier&#8217;s larger footprint and revised layout were confirmed last year, the final design introduces a series of external refinements shaped by community feedback. These include curved and bench seating positioned to face the bay, wheelchair-accessible fishing platforms and [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":216,"featured_media":117867,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-117855","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Final plans released for St Leonards Pier rebuild - Bellarine Times<\/title>\n<meta name=\"description\" content=\"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Final plans released for St Leonards Pier rebuild - Bellarine Times\" \/>\n<meta property=\"og:description\" content=\"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/\" \/>\n<meta property=\"og:site_name\" content=\"Bellarine Times\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-18T17:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-07T10:30:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg?_t=1775557856\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ellie Claringbold\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ellie Claringbold\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/\"},\"author\":{\"name\":\"Ellie Claringbold\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/32abddd83bad3e2425166905b3e3aaff\"},\"headline\":\"Final plans released for St Leonards Pier rebuild\",\"datePublished\":\"2026-03-18T17:00:00+00:00\",\"dateModified\":\"2026-04-07T10:30:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/\"},\"wordCount\":434,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2026\\\/03\\\/18-march-tng-6.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/\",\"name\":\"Final plans released for St Leonards Pier rebuild - Bellarine Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2026\\\/03\\\/18-march-tng-6.jpg\",\"datePublished\":\"2026-03-18T17:00:00+00:00\",\"dateModified\":\"2026-04-07T10:30:54+00:00\",\"description\":\"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2026\\\/03\\\/18-march-tng-6.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2026\\\/03\\\/18-march-tng-6.jpg\",\"width\":1200,\"height\":630,\"caption\":\"An artist's impression of the new-look St Leonards pier. Photo: Supplied.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/final-plans-released-for-st-leonards-pier-rebuild\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Final plans released for St Leonards Pier rebuild\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"name\":\"Bellarine Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\",\"name\":\"Bellarine Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":291,\"height\":38,\"caption\":\"Bellarine Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/32abddd83bad3e2425166905b3e3aaff\",\"name\":\"Ellie Claringbold\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g\",\"caption\":\"Ellie Claringbold\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/author\\\/ellie\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Final plans released for St Leonards Pier rebuild - Bellarine Times","description":"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/","og_locale":"en_US","og_type":"article","og_title":"Final plans released for St Leonards Pier rebuild - Bellarine Times","og_description":"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.","og_url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/","og_site_name":"Bellarine Times","article_published_time":"2026-03-18T17:00:00+00:00","article_modified_time":"2026-04-07T10:30:54+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg?_t=1775557856","type":"image\/jpeg"}],"author":"Ellie Claringbold","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ellie Claringbold","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/"},"author":{"name":"Ellie Claringbold","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/32abddd83bad3e2425166905b3e3aaff"},"headline":"Final plans released for St Leonards Pier rebuild","datePublished":"2026-03-18T17:00:00+00:00","dateModified":"2026-04-07T10:30:54+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/"},"wordCount":434,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/","name":"Final plans released for St Leonards Pier rebuild - Bellarine Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg","datePublished":"2026-03-18T17:00:00+00:00","dateModified":"2026-04-07T10:30:54+00:00","description":"Final plans for the St Leonards Pier rebuild are out. Discover the new accessible design, fishing platforms, and community-led features.","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2026\/03\/18-march-tng-6.jpg","width":1200,"height":630,"caption":"An artist's impression of the new-look St Leonards pier. Photo: Supplied."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/final-plans-released-for-st-leonards-pier-rebuild\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/"},{"@type":"ListItem","position":2,"name":"Final plans released for St Leonards Pier rebuild"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","name":"Bellarine Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization","name":"Bellarine Times","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","width":291,"height":38,"caption":"Bellarine Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/32abddd83bad3e2425166905b3e3aaff","name":"Ellie Claringbold","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcd91a2add82ecaedf8722c8c44c7bf9cd7be0f12939f097b32bc1e405ab8d89?s=96&d=mm&r=g","caption":"Ellie Claringbold"},"url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/author\/ellie\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/117855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/users\/216"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/comments?post=117855"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/117855\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media\/117867"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media?parent=117855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/categories?post=117855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/tags?post=117855"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/post_folder?post=117855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}