	{"id":14640,"date":"2018-09-05T09:30:11","date_gmt":"2018-09-05T09:30:11","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?p=14640"},"modified":"2018-09-06T11:36:19","modified_gmt":"2018-09-06T11:36:19","slug":"alcoa-community-update-power-station-decommissioning-september-6-2018","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/","title":{"rendered":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018"},"content":{"rendered":"<p>Power station decommissioning As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure.<\/p>\n<p>Further to last week\u2019s Community Update (Surf Coast Times, 30 August), Alcoa is continuing to work with the principal contractor to plan for the demolition of the remaining power station structure.<\/p>\n<p>The detailed investigation into why the structure only partially collapsed is informing the method for the future demolition. The principal contractor has appointed a suitably qualified subcontractor to complete the demolition, which is expected to include the use of explosives placed via a combination of remote controlled technologies and manual application techniques. The proposed demolition methodology is being reviewed with Worksafe Victoria.<\/p>\n<p>Site mobilisation and initial preparation works have commenced including the removal of the coal conveyor which was felled on 30 May.<\/p>\n<p>It is expected that the demolition of the remaining power station structure will occur in late September or October.<\/p>\n<p>On the day of the scheduled demolition, the activity will only proceed if the wind direction is away from the township. A 400-metre exclusion zone will be patrolled by sentries, and asbestos monitoring will be in place during and after the demolition activity.<\/p>\n<p>Prior to the demolition, Alcoa will write to Anglesea residents and local businesses and host information sessions to give interested community members the opportunity to discuss the activity with Alcoa and the principal contractor. Dates and times for these sessions, together with ongoing updates about the activity, will be communicated in the weekly\u00a0Alcoa Community Updates\u2019 published in the Surf Coast Times and posted on alcoa.com.au\/anglesea.<\/p>\n<p>While the planning for the demolition is ongoing, Alcoa remains committed to ensuring the continued safety of onsite personnel and the community.<\/p>\n<p>Monitoring of the power station structure continues to confirm it is stable.<\/p>\n<p>Air monitoring remains in place. No airborne asbestos fibres have been detected above the Occupational Health and Safety Regulations 2017 asbestos exposure standard. As stated previously, the demolition occurred following a twelve-month asbestos removal program, a process regulated by Worksafe Victoria.<\/p>\n<p>The safety exclusion zone also remains in place and is monitored by security officers and video surveillance 24 hours per day. Worksafe Victoria and EPA Victoria continue to be closely informed about activities at the site.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power station decommissioning As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":26,"featured_media":14641,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-14640","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times\" \/>\n<meta property=\"og:description\" content=\"Power station decommissioning As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/\" \/>\n<meta property=\"og:site_name\" content=\"Bellarine Times\" \/>\n<meta property=\"article:author\" content=\"jamespetertaylor\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-05T09:30:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-09-06T11:36:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png\" \/>\n\t<meta property=\"og:image:width\" content=\"247\" \/>\n\t<meta property=\"og:image:height\" content=\"356\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@notthatjt\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\"},\"headline\":\"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018\",\"datePublished\":\"2018-09-05T09:30:11+00:00\",\"dateModified\":\"2018-09-06T11:36:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/\"},\"wordCount\":410,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2018\\\/09\\\/aaaa-24.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/\",\"name\":\"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2018\\\/09\\\/aaaa-24.png\",\"datePublished\":\"2018-09-05T09:30:11+00:00\",\"dateModified\":\"2018-09-06T11:36:19+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2018\\\/09\\\/aaaa-24.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2018\\\/09\\\/aaaa-24.png\",\"width\":247,\"height\":356,\"caption\":\"The remaining power station structure.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/alcoa-community-update-power-station-decommissioning-september-6-2018\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"name\":\"Bellarine Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\",\"name\":\"Bellarine Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":291,\"height\":38,\"caption\":\"Bellarine Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\",\"name\":\"James Taylor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"caption\":\"James Taylor\"},\"description\":\"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).\",\"sameAs\":[\"jamespetertaylor\",\"https:\\\/\\\/x.com\\\/@notthatjt\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/author\\\/jamestaylor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/","og_locale":"en_US","og_type":"article","og_title":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times","og_description":"Power station decommissioning As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/","og_site_name":"Bellarine Times","article_author":"jamespetertaylor","article_published_time":"2018-09-05T09:30:11+00:00","article_modified_time":"2018-09-06T11:36:19+00:00","og_image":[{"width":247,"height":356,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png","type":"image\/png"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_creator":"@notthatjt","twitter_misc":{"Written by":"James Taylor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677"},"headline":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018","datePublished":"2018-09-05T09:30:11+00:00","dateModified":"2018-09-06T11:36:19+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/"},"wordCount":410,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/","name":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018 - Bellarine Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png","datePublished":"2018-09-05T09:30:11+00:00","dateModified":"2018-09-06T11:36:19+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2018\/09\/aaaa-24.png","width":247,"height":356,"caption":"The remaining power station structure."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/alcoa-community-update-power-station-decommissioning-september-6-2018\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/"},{"@type":"ListItem","position":2,"name":"Alcoa Community Update: Power station decommissioning \u2013 September 6, 2018"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","name":"Bellarine Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization","name":"Bellarine Times","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","width":291,"height":38,"caption":"Bellarine Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677","name":"James Taylor","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","caption":"James Taylor"},"description":"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).","sameAs":["jamespetertaylor","https:\/\/x.com\/@notthatjt"],"url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/author\/jamestaylor\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/14640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/comments?post=14640"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/14640\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media\/14641"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media?parent=14640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/categories?post=14640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/tags?post=14640"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/post_folder?post=14640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}