	{"id":19088,"date":"2019-01-02T16:16:41","date_gmt":"2019-01-02T16:16:41","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?p=19088"},"modified":"2019-01-02T20:48:37","modified_gmt":"2019-01-02T20:48:37","slug":"shifting-sands-apollo-bay-erosion-report-released-works-underway","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/","title":{"rendered":"Shifting sands: Apollo Bay erosion report released, works underway"},"content":{"rendered":"<p>THE Department of Environment, Land, Water and Planning (DELWP) and the Otway Coast Committee (OCC) recently started works to reinstate access along the Apollo Bay and Marengo foreshore, following winter storms that caused extensive damage.<\/p>\n<p>DELWP and the OCC are working alongside Regional Roads Victoria (RRV), Colac Otway Shire and coastal engineers GHD to develop next steps for the Apollo Bay and Marengo foreshores, following consultation with the local community.<\/p>\n<p>Regional Manager, Land and Built Environment Programs, Greg Leece said they were prioritising access points along the beach to ensure everyone could get onto the beach safely during summer.<\/p>\n<p>\u201cSand will be carted from Wild Dog Creek to cover the rock revetments that were built by RRV last\u00a0month, and spotters will be on site to ensure the safety of the Hooded Plovers,\u201d Mr Leece said.<\/p>\n<p>\u201cThe construction of a footpath is underway along the revetments, replacing the path that was destroyed during the winter storms.<\/p>\n<p>\u201cWe understand it\u2019s coming into peak season for the Apollo Bay community so we\u2019re working to install stairs along the foreshore, over the RRV revetments, so everyone has safe access to the beach.\u201d<\/p>\n<p>He said that DELWP engaged coastal engineers GHD to design and report on short-term remedial works and long-term options for coastal erosion in Apollo Bay and Marengo.<\/p>\n<p>\u201cThese options are available to view at length in the GHD Apollo Bay Coastal Protection Report online via the Engage Victoria page.<\/p>\n<p>\u201cWe\u2019re keen for the community to look over the report and learn about the recommendations that are featured including erosion control options, as erosion is going to be a long-term issue for the township.<\/p>\n<p>\u201cSand cartage is going to be an ongoing process for the Apollo Bay and Marengo communities, as the climate continues to change and have erosion events that affect the foreshore.<\/p>\n<p>\u201cAt this stage, we\u2019re working towards finding the next steps for erosion at Apollo Bay and Marengo, and we will continue working with multiple agencies and the community to find the best solution for the area.\u201d<\/p>\n<p>To view GHD\u2019s Apollo Bay Protection Report, visit engage.vic.gov.au\/apollo-bay-and-marengoerosion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE Department of Environment, Land, Water and Planning (DELWP) and the Otway Coast Committee (OCC) recently started works to reinstate access along the Apollo Bay and Marengo foreshore, following winter storms that caused extensive damage. DELWP and the OCC are working alongside Regional Roads Victoria (RRV), Colac Otway Shire and coastal engineers GHD to develop [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":26,"featured_media":19089,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-19088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times\" \/>\n<meta property=\"og:description\" content=\"THE Department of Environment, Land, Water and Planning (DELWP) and the Otway Coast Committee (OCC) recently started works to reinstate access along the Apollo Bay and Marengo foreshore, following winter storms that caused extensive damage. DELWP and the OCC are working alongside Regional Roads Victoria (RRV), Colac Otway Shire and coastal engineers GHD to develop [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/\" \/>\n<meta property=\"og:site_name\" content=\"Bellarine Times\" \/>\n<meta property=\"article:author\" content=\"jamespetertaylor\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-02T16:16:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-01-02T20:48:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png\" \/>\n\t<meta property=\"og:image:width\" content=\"762\" \/>\n\t<meta property=\"og:image:height\" content=\"338\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@notthatjt\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\"},\"headline\":\"Shifting sands: Apollo Bay erosion report released, works underway\",\"datePublished\":\"2019-01-02T16:16:41+00:00\",\"dateModified\":\"2019-01-02T20:48:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/\"},\"wordCount\":365,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/01\\\/Picture-30.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/\",\"name\":\"Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/01\\\/Picture-30.png\",\"datePublished\":\"2019-01-02T16:16:41+00:00\",\"dateModified\":\"2019-01-02T20:48:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/01\\\/Picture-30.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/01\\\/Picture-30.png\",\"width\":762,\"height\":338,\"caption\":\"The erosion along the Apollo Bay foreshore.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/shifting-sands-apollo-bay-erosion-report-released-works-underway\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shifting sands: Apollo Bay erosion report released, works underway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"name\":\"Bellarine Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\",\"name\":\"Bellarine Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":291,\"height\":38,\"caption\":\"Bellarine Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\",\"name\":\"James Taylor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"caption\":\"James Taylor\"},\"description\":\"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).\",\"sameAs\":[\"jamespetertaylor\",\"https:\\\/\\\/x.com\\\/@notthatjt\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/author\\\/jamestaylor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/","og_locale":"en_US","og_type":"article","og_title":"Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times","og_description":"THE Department of Environment, Land, Water and Planning (DELWP) and the Otway Coast Committee (OCC) recently started works to reinstate access along the Apollo Bay and Marengo foreshore, following winter storms that caused extensive damage. DELWP and the OCC are working alongside Regional Roads Victoria (RRV), Colac Otway Shire and coastal engineers GHD to develop [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/","og_site_name":"Bellarine Times","article_author":"jamespetertaylor","article_published_time":"2019-01-02T16:16:41+00:00","article_modified_time":"2019-01-02T20:48:37+00:00","og_image":[{"width":762,"height":338,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png","type":"image\/png"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_creator":"@notthatjt","twitter_misc":{"Written by":"James Taylor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677"},"headline":"Shifting sands: Apollo Bay erosion report released, works underway","datePublished":"2019-01-02T16:16:41+00:00","dateModified":"2019-01-02T20:48:37+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/"},"wordCount":365,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/","name":"Shifting sands: Apollo Bay erosion report released, works underway - Bellarine Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png","datePublished":"2019-01-02T16:16:41+00:00","dateModified":"2019-01-02T20:48:37+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/01\/Picture-30.png","width":762,"height":338,"caption":"The erosion along the Apollo Bay foreshore."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/shifting-sands-apollo-bay-erosion-report-released-works-underway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/"},{"@type":"ListItem","position":2,"name":"Shifting sands: Apollo Bay erosion report released, works underway"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","name":"Bellarine Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization","name":"Bellarine Times","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","width":291,"height":38,"caption":"Bellarine Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677","name":"James Taylor","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","caption":"James Taylor"},"description":"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).","sameAs":["jamespetertaylor","https:\/\/x.com\/@notthatjt"],"url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/author\/jamestaylor\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/19088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/comments?post=19088"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/19088\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media\/19089"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media?parent=19088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/categories?post=19088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/tags?post=19088"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/post_folder?post=19088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}