	{"id":75648,"date":"2023-09-08T00:45:50","date_gmt":"2023-09-07T14:45:50","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?p=75648"},"modified":"2023-09-08T08:46:22","modified_gmt":"2023-09-07T22:46:22","slug":"ramping-up","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/","title":{"rendered":"RAMPING UP: St Leonards Boat Ramp to start construction next year"},"content":{"rendered":"<p>THE state government has revised designs for a multi-million-dollar upgrade to St Leonards Boat Ramp, which it expects to begin building after the coming summer.<\/p>\n<p>A $2.8-million first stage would rebuild and extend the site&#8217;s T-shaped jetty, with lower landings for improved access and integrated wave screens.<\/p>\n<p>Further staged would include a total of six boat ramps on either side of the jetty \u2013 two more than earlier concepts \u2013 and pedestrian paths to improve connections to St Leonards foreshore.<\/p>\n<p>An existing overflow car park opposite Bluff Road would also remain, and the present exit point would be reconfigured into rigging bays.<\/p>\n<p>State agency Better Boating Victoria (BBV) shared an update on its detailed designs in its most recent information bulletin shared last month, including changes to a draft concept plan released in December last year.<\/p>\n<p>&#8220;Following the analysis and consideration of feedback received through the public consultation process a concept has been developed and released, including provision of wave screens along the central jetty extending seawards as well as an extended T on the end that will also incorporate wave screens to provide shelter from onshore wind and waves,&#8221; it stated.<\/p>\n<p>&#8220;No seasonal car park options were featured.&#8221;<\/p>\n<p>Other changes since initial release of the design include two extra boat ramp lanes, six dedicated rigging lanes and a derigging area, and pedestrian access around the facility.<\/p>\n<p>&#8220;These changes have been made to enhance safety at the facility \u2013 more lanes for boaters to retrieve during poor weather conditions,&#8221; BBV stated.<\/p>\n<figure id=\"attachment_75653\" aria-describedby=\"caption-attachment-75653\" style=\"width: 581px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-75653 \" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/18.png?_t=1694040605\" alt=\"\" width=\"581\" height=\"365\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/18.png 1194w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/18-300x188.png 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/18-1024x642.png 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/18-768x482.png 768w\" sizes=\"auto, (max-width: 581px) 100vw, 581px\" \/><figcaption id=\"caption-attachment-75653\" class=\"wp-caption-text\">The latest designs for a St Leonards Boat Ramp upgrade. Photo: SUPPLIED<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>The revised concepts have also reconfigured traffic access to the site to avoid removal of foreshore cypress trees, which had drawn community opposition when proposed in earlier drafts.<\/p>\n<p>BBV said it consulted with local boaters and community representatives in intervening months to further refine its concept.<\/p>\n<p>The agency expected to start construction on the jetty and wave baffles after Easter 2024, subject to permits and approvals.<\/p>\n<p>It also indicated it would continue planning for delivery of additional ramp lanes and pedestrian path in a later year.<\/p>\n<p>An upgrade to the St Leonard&#8217;s boat launch has been on the radar of the state government and users groups for several years.<\/p>\n<p>Bellarine MP Alison Marchant announced up to $20 million to repair and improve the dilapidated facility during her election campaign last year.<\/p>\n<p>Ms Marchant said this week she welcomed progress of the project.<\/p>\n<p>&#8220;The designs for the St Leonards Boat Ramp have been updated to accommodate feedback from boaters and the community.<\/p>\n<p>&#8220;I am proud to have this investment for the St Leonards boating community and I thank them for their ongoing engagement with this project.<\/p>\n<p>&#8220;This upgrade will improve safety at the ramp and will continue to give boaters access to the best fishing along the Bellarine Peninsula.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE state government has revised designs for a multi-million-dollar upgrade to St Leonards Boat Ramp, which it expects to begin building after the coming summer. A $2.8-million first stage would rebuild and extend the site&#8217;s T-shaped jetty, with lower landings for improved access and integrated wave screens. Further staged would include a total of six [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":195,"featured_media":75651,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-75648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times<\/title>\n<meta name=\"description\" content=\"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times\" \/>\n<meta property=\"og:description\" content=\"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/\" \/>\n<meta property=\"og:site_name\" content=\"Bellarine Times\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-07T14:45:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-07T22:46:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Billy Higgins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Billy Higgins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/\"},\"author\":{\"name\":\"Billy Higgins\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\"},\"headline\":\"RAMPING UP: St Leonards Boat Ramp to start construction next year\",\"datePublished\":\"2023-09-07T14:45:50+00:00\",\"dateModified\":\"2023-09-07T22:46:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/\"},\"wordCount\":487,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2023\\\/09\\\/Feature-Image-2023-09-07T084658.284.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/\",\"name\":\"RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2023\\\/09\\\/Feature-Image-2023-09-07T084658.284.png\",\"datePublished\":\"2023-09-07T14:45:50+00:00\",\"dateModified\":\"2023-09-07T22:46:22+00:00\",\"description\":\"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2023\\\/09\\\/Feature-Image-2023-09-07T084658.284.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2023\\\/09\\\/Feature-Image-2023-09-07T084658.284.png\",\"width\":1200,\"height\":630,\"caption\":\"Photo: SUPPLIED\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/news\\\/ramping-up\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RAMPING UP: St Leonards Boat Ramp to start construction next year\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"name\":\"Bellarine Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#organization\",\"name\":\"Bellarine Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/3\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":291,\"height\":38,\"caption\":\"Bellarine Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\",\"name\":\"Billy Higgins\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"caption\":\"Billy Higgins\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bellarinetimes\\\/author\\\/billyhiggins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times","description":"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/","og_locale":"en_US","og_type":"article","og_title":"RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times","og_description":"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.","og_url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/","og_site_name":"Bellarine Times","article_published_time":"2023-09-07T14:45:50+00:00","article_modified_time":"2023-09-07T22:46:22+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png","type":"image\/png"}],"author":"Billy Higgins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Billy Higgins","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/"},"author":{"name":"Billy Higgins","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/3238e894a9405429473101b410554085"},"headline":"RAMPING UP: St Leonards Boat Ramp to start construction next year","datePublished":"2023-09-07T14:45:50+00:00","dateModified":"2023-09-07T22:46:22+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/"},"wordCount":487,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/","name":"RAMPING UP: St Leonards Boat Ramp to start construction next year - Bellarine Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png","datePublished":"2023-09-07T14:45:50+00:00","dateModified":"2023-09-07T22:46:22+00:00","description":"St Leonards Boat Ramp Upgrade to include new jetty, wave screens, and pedestrian paths. Construction to begin after Easter 2024.","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2023\/09\/Feature-Image-2023-09-07T084658.284.png","width":1200,"height":630,"caption":"Photo: SUPPLIED"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/news\/ramping-up\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/"},{"@type":"ListItem","position":2,"name":"RAMPING UP: St Leonards Boat Ramp to start construction next year"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","name":"Bellarine Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#organization","name":"Bellarine Times","url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/3\/2019\/08\/cropped-logo.png","width":291,"height":38,"caption":"Bellarine Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/#\/schema\/person\/3238e894a9405429473101b410554085","name":"Billy Higgins","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","caption":"Billy Higgins"},"url":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/author\/billyhiggins\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/75648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/users\/195"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/comments?post=75648"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/posts\/75648\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media\/75651"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/media?parent=75648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/categories?post=75648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/tags?post=75648"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bellarinetimes\/wp-json\/wp\/v2\/post_folder?post=75648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}