	{"id":75006,"date":"2021-04-01T04:57:07","date_gmt":"2021-03-31T17:57:07","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/?p=75006"},"modified":"2022-02-27T11:06:47","modified_gmt":"2022-02-27T00:06:47","slug":"asbestos-removal-begins-at-ross-park","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/","title":{"rendered":"Asbestos removal begins at Ross Park"},"content":{"rendered":"<p>WORK is underway to remove asbestos from Ross Park in Kennington after the park was closed in January when the dangerous material was found scattered over the reserve.<\/p>\n<p>City of Greater Bendigo presentation and assets director Brian Westley said the asbestos at the park is non-friable and may have been mixed with cement or another type of hard bonding material, meaning it is low risk to the public.<\/p>\n<p>\u201cAsbestos is dangerous when fibres are inhaled, although non-friable asbestos is bound and not commonly released into the air,\u201d Mr Westley said.<\/p>\n<p>Remediation works at the park will include the removal of visible asbestos as well as excavation of the soil near the basketball court, monitored by a soil hygienist expert.<\/p>\n<p>Fresh soil, turf and new mulch will be brought into the park once the contaminated soil is removed.<\/p>\n<p>Air monitoring systems will be used during the works, although an air-quality survey found the air in the park to be safe.<\/p>\n<p>The work is expected to be completed by next month and the park open by mid-April.<\/p>\n<p>\u201cThe City would like to thank the community for their patience and we\u2019re looking forward to seeing children enjoying Ross Park in the near future,\u201d Mr Westley said.<\/p>\n<p>In February a report environmental hygienist found that there was no asbestos material found near the playground.<\/p>\n<p>\u201cMaterials containing asbestos were scattered across the reserve,\u201d Mr Westley said. \u201cIt is most likely that the asbestos is a decades old legacy issue.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WORK is underway to remove asbestos from Ross Park in Kennington after the park was closed in January when the dangerous material was found scattered over the reserve. City of Greater Bendigo presentation and assets director Brian Westley said the asbestos at the park is non-friable and may have been mixed with cement or another [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":185,"featured_media":75007,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-75006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Asbestos removal begins at Ross Park - Bendigo Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Asbestos removal begins at Ross Park - Bendigo Times\" \/>\n<meta property=\"og:description\" content=\"WORK is underway to remove asbestos from Ross Park in Kennington after the park was closed in January when the dangerous material was found scattered over the reserve. City of Greater Bendigo presentation and assets director Brian Westley said the asbestos at the park is non-friable and may have been mixed with cement or another [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/\" \/>\n<meta property=\"og:site_name\" content=\"Bendigo Times\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-31T17:57:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-27T00:06:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jonathon Magrath\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jonathon Magrath\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/\"},\"author\":{\"name\":\"Jonathon Magrath\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#\\\/schema\\\/person\\\/2cdab3faaf6adb4dd0a7be4fa1d07894\"},\"headline\":\"Asbestos removal begins at Ross Park\",\"datePublished\":\"2021-03-31T17:57:07+00:00\",\"dateModified\":\"2022-02-27T00:06:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/\"},\"wordCount\":251,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/03\\\/DSC_0151-scaled.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/\",\"name\":\"Asbestos removal begins at Ross Park - Bendigo Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/03\\\/DSC_0151-scaled.jpg\",\"datePublished\":\"2021-03-31T17:57:07+00:00\",\"dateModified\":\"2022-02-27T00:06:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/03\\\/DSC_0151-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/03\\\/DSC_0151-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Park remedy: Ross Park is set to re-open in April following asbestos removal. Photo: JONATHON MAGRATH\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/news\\\/asbestos-removal-begins-at-ross-park\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Asbestos removal begins at Ross Park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/\",\"name\":\"Bendigo Times\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#organization\",\"name\":\"Bendigo Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/02\\\/BDT-logo-masthead-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/24\\\/2021\\\/02\\\/BDT-logo-masthead-scaled.jpg\",\"width\":2560,\"height\":491,\"caption\":\"Bendigo Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/#\\\/schema\\\/person\\\/2cdab3faaf6adb4dd0a7be4fa1d07894\",\"name\":\"Jonathon Magrath\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/bendigotimes\\\/author\\\/jonathon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Asbestos removal begins at Ross Park - Bendigo Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/","og_locale":"en_US","og_type":"article","og_title":"Asbestos removal begins at Ross Park - Bendigo Times","og_description":"WORK is underway to remove asbestos from Ross Park in Kennington after the park was closed in January when the dangerous material was found scattered over the reserve. City of Greater Bendigo presentation and assets director Brian Westley said the asbestos at the park is non-friable and may have been mixed with cement or another [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/","og_site_name":"Bendigo Times","article_published_time":"2021-03-31T17:57:07+00:00","article_modified_time":"2022-02-27T00:06:47+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg","type":"image\/jpeg"}],"author":"Jonathon Magrath","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jonathon Magrath","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/"},"author":{"name":"Jonathon Magrath","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#\/schema\/person\/2cdab3faaf6adb4dd0a7be4fa1d07894"},"headline":"Asbestos removal begins at Ross Park","datePublished":"2021-03-31T17:57:07+00:00","dateModified":"2022-02-27T00:06:47+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/"},"wordCount":251,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/","url":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/","name":"Asbestos removal begins at Ross Park - Bendigo Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg","datePublished":"2021-03-31T17:57:07+00:00","dateModified":"2022-02-27T00:06:47+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/03\/DSC_0151-scaled.jpg","width":2560,"height":1707,"caption":"Park remedy: Ross Park is set to re-open in April following asbestos removal. Photo: JONATHON MAGRATH"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/news\/asbestos-removal-begins-at-ross-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/"},{"@type":"ListItem","position":2,"name":"Asbestos removal begins at Ross Park"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/","name":"Bendigo Times","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#organization","name":"Bendigo Times","url":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/02\/BDT-logo-masthead-scaled.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/24\/2021\/02\/BDT-logo-masthead-scaled.jpg","width":2560,"height":491,"caption":"Bendigo Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/#\/schema\/person\/2cdab3faaf6adb4dd0a7be4fa1d07894","name":"Jonathon Magrath","url":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/author\/jonathon\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/posts\/75006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/users\/185"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/comments?post=75006"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/posts\/75006\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/media\/75007"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/media?parent=75006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/categories?post=75006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/tags?post=75006"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/bendigotimes\/wp-json\/wp\/v2\/post_folder?post=75006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}