	{"id":101031,"date":"2024-08-06T04:00:00","date_gmt":"2024-08-05T18:00:00","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?p=101031"},"modified":"2024-07-31T16:27:01","modified_gmt":"2024-07-31T06:27:01","slug":"feedback-sought-on-renewable-energy-plans","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/","title":{"rendered":"Feedback sought on renewable energy plans"},"content":{"rendered":"<p>COMMUNITIES, landholders, Traditional Owners and the energy industry have been invited to have their say on the development of the long-term strategic plan for Victoria&#8217;s renewable energy and its major transmission infrastructure.<\/p>\n<p>The state government is developing the Victorian Transmission Plan, and last week, VicGrid &#8211; the government agency responsible for planning and developing the Renewable Energy Zones &#8211; released a draft of the Victorian Transmission\u00a0Plan guidelines.<\/p>\n<p>The guidelines explain how VicGrid will determine how much renewable energy is needed to be generated where and by when, what transmission projects are required, and how VicGrid will partner with communities and industry to make these decisions.<\/p>\n<p>It also includes an initial study area, showing which parts of Victoria will be investigated further to determine the best places to host future wind and solar generation.<\/p>\n<p>According to a map in the community summary of the Victorian Transmission Plan, wind projects will be excluded under Victoria&#8217;s planning laws from the entirety of the Bellarine Peninsula, central Geelong and in a band stretching west along the coastline towards the Twelve Apostles.<\/p>\n<p>Much of the hinterland to the west of Geelong is classified as Tier 1 and Tier 2 areas, which are &#8220;most suitable for investigation&#8221; and &#8220;suitable for investigation&#8221; respectively.<\/p>\n<p>The study area will be narrowed down to smaller areas for investigation and eventually, proposed Renewable Energy Zones through further engagement\u00a0and analysis.<\/p>\n<p>VicGrid chief executive officer Alistair Parker said community input would play a crucial role at this stage and throughout the process of developing the Victorian Transmission Plan.<\/p>\n<p>&#8220;We are changing the way energy infrastructure is delivered in Victoria and early and meaningful engagement is at the heart of our approach.<\/p>\n<p>&#8220;We need the input of regional communities, farmers, landholders and First Peoples so we can get this right for all Victorians, reduce impacts and deliver real benefits.&#8221;<\/p>\n<p>Mr Parker said the energy industry also had a role to play in informing the Victorian Transmission Plan, and ncouraged businesses to engage with VicGrid to share their knowledge and expertise.<\/p>\n<p>Consultation on the guidelines is open until August 25, while consultation on the study areas is open until September 30.<\/p>\n<p>A draft Victorian Transmission Plan will be published early in 2025 with a further round of consultation before publication of the final plan by July 2025.<\/p>\n<p>For more information, including details of community drop-in sessions, head to <a href=\"http:\/\/engage.vic.gov.au\/vicgrid\" target=\"_blank\" rel=\"noopener\">engage.vic.gov.au\/vicgrid<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>COMMUNITIES, landholders, Traditional Owners and the energy industry have been invited to have their say on the development of the long-term strategic plan for Victoria&#8217;s renewable energy and its major transmission infrastructure. The state government is developing the Victorian Transmission Plan, and last week, VicGrid &#8211; the government agency responsible for planning and developing the [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":26,"featured_media":101032,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-101031","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Feedback sought on renewable energy plans - Geelong Times<\/title>\n<meta name=\"description\" content=\"Shape Victoria&#039;s Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan &amp; major transmission infrastructure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feedback sought on renewable energy plans - Geelong Times\" \/>\n<meta property=\"og:description\" content=\"Shape Victoria&#039;s Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan &amp; major transmission infrastructure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/\" \/>\n<meta property=\"og:site_name\" content=\"Geelong Times\" \/>\n<meta property=\"article:author\" content=\"jamespetertaylor\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-05T18:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@notthatjt\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\"},\"headline\":\"Feedback sought on renewable energy plans\",\"datePublished\":\"2024-08-05T18:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/\"},\"wordCount\":402,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2024\\\/07\\\/Moynetransmission_55052-1.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/\",\"name\":\"Feedback sought on renewable energy plans - Geelong Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2024\\\/07\\\/Moynetransmission_55052-1.jpg\",\"datePublished\":\"2024-08-05T18:00:00+00:00\",\"description\":\"Shape Victoria's Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan & major transmission infrastructure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2024\\\/07\\\/Moynetransmission_55052-1.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2024\\\/07\\\/Moynetransmission_55052-1.jpg\",\"width\":1200,\"height\":630,\"caption\":\"The Victorian Transmission Plan guidelines explain how VicGrid will determine how much renewable energy is needed to be generated where and by when and what transmission projects are required. Photo: FACEBOOK\\\/MOYNE SHIRE COUNCIL\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/feedback-sought-on-renewable-energy-plans\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Feedback sought on renewable energy plans\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"name\":\"Geelong Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\",\"name\":\"Geelong Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"width\":248,\"height\":37,\"caption\":\"Geelong Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\",\"name\":\"James Taylor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g\",\"caption\":\"James Taylor\"},\"description\":\"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).\",\"sameAs\":[\"jamespetertaylor\",\"https:\\\/\\\/x.com\\\/@notthatjt\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/author\\\/jamestaylor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feedback sought on renewable energy plans - Geelong Times","description":"Shape Victoria's Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan & major transmission infrastructure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/","og_locale":"en_US","og_type":"article","og_title":"Feedback sought on renewable energy plans - Geelong Times","og_description":"Shape Victoria's Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan & major transmission infrastructure.","og_url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/","og_site_name":"Geelong Times","article_author":"jamespetertaylor","article_published_time":"2024-08-05T18:00:00+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg","type":"image\/jpeg"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_creator":"@notthatjt","twitter_misc":{"Written by":"James Taylor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677"},"headline":"Feedback sought on renewable energy plans","datePublished":"2024-08-05T18:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/"},"wordCount":402,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/","name":"Feedback sought on renewable energy plans - Geelong Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg","datePublished":"2024-08-05T18:00:00+00:00","description":"Shape Victoria's Renewable Energy Future! Share your feedback on the draft Victorian Renewable Energy Plan & major transmission infrastructure.","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2024\/07\/Moynetransmission_55052-1.jpg","width":1200,"height":630,"caption":"The Victorian Transmission Plan guidelines explain how VicGrid will determine how much renewable energy is needed to be generated where and by when and what transmission projects are required. Photo: FACEBOOK\/MOYNE SHIRE COUNCIL"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/feedback-sought-on-renewable-energy-plans\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/"},{"@type":"ListItem","position":2,"name":"Feedback sought on renewable energy plans"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","name":"Geelong Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization","name":"Geelong Times","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","width":248,"height":37,"caption":"Geelong Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677","name":"James Taylor","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4ceb72a20a2941ff28326fc7c1d56a74ecb6e6ac1d9b5a50749c0314e0b11d5a?s=96&d=mm&r=g","caption":"James Taylor"},"description":"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).","sameAs":["jamespetertaylor","https:\/\/x.com\/@notthatjt"],"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/author\/jamestaylor\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/101031","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/comments?post=101031"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/101031\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media\/101032"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media?parent=101031"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/categories?post=101031"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/tags?post=101031"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/post_folder?post=101031"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}