	{"id":33094,"date":"2020-07-02T00:47:18","date_gmt":"2020-07-01T14:47:18","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?p=33094"},"modified":"2020-07-02T12:44:03","modified_gmt":"2020-07-02T02:44:03","slug":"stage-two-portarlington-reserve","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/","title":{"rendered":"Stage two complete for Portarlington reserve"},"content":{"rendered":"<p>THE CITY of Greater Geelong council has completed Stage 2 of the Portarlington Recreation Reserve (PRR) 10-year masterplan, after six weeks of community consultation running April-June.<\/p>\n<p>The city sought feedback from the community and stakeholders for a new master plan (set to replace the 2011 version) addressing the increased pressure on local infrastructure due to Bellarine\u2019s booming population.<\/p>\n<p>The city said consultants will now review feedback, along with existing analysis of issues and opportunities, to contribute to the draft plan &#8211; scheduled to be developed over the coming months.<\/p>\n<p>It is expected the draft will be released after council elections for further community feedback.<\/p>\n<p>An interactive map covering the 38 hectares gave contributors the opportunity to add pins to identify \u2018the things they do, the things they love and the things they\u2019d like to see improved\u2019.<\/p>\n<p>The city implored local residents, sporting clubs, and regular visitors to provide information about key amenities, access, and future event needs or opportunities relating to the PRR.<\/p>\n<p>There were 76 contribution for this activity with community members calling out for areas filled with Kikuyu grass to be replaced with native plants.<\/p>\n<p>Pins highlighted cultural and environmental values, landscape and amenities, sporting infrastructure requirements, trail and access points and events and function spaces.<\/p>\n<p>Other suggestions included space for a community garden, wetlands, upgrades to public toilets, ensuring protection for the native habitat and a community hub.<\/p>\n<p>A poll which asked contributors \u201cWhat do you value most about the reserve?\u201d and received 191 votes, with environment and landscape amenity coming in first at 33 per cent (61 votes).<\/p>\n<p>Sporting ovals and main pavilions receiving 29 per cent (56 votes) followed by passive use of the reserve, 14 per cent (26 votes); attending events, 13 per cent (24 votes); netball courts and pavilion, 10 per cent (19 votes); the guides hall and using the playground came in at one per cent each with (2 votes) and (1 vote) respectively.<\/p>\n<p>The recreation reserve plays an important part in the lives of locals and visitors and is home to the Portarlington Sports Club, Portarlington Fire Brigade and the Bellarine Agricultural Show.<\/p>\n<p>Geelong mayor Stephanie Asher said she was excited to see the reserve evolve with the community at its forefront.<\/p>\n<p>\u201cThe township of Portarlington is quite different to how it looked nine years ago, which is why it makes sense to reset and to reflect the community\u2019s current and future.<\/p>\n<p>\u201cWe\u2019re eager to hear what\u2019s important to local residents, sports clubs\u2019 members and visitors alike, how they currently use the reserve and their \u2018clever and creative\u2019 ideas to ensure its<br \/>\nvibrant future.\u201d<\/p>\n<p>Following engagement, issues and opportunities will be developed and released in a draft plan for further community feedback.<\/p>\n<p>Local community groups have advocated for the review with support and funding for the project provided by the state government.<\/p>\n<p>If you would like more information, head to <a href=\"http:\/\/geelongaustralia.com.au\" target=\"_blank\" rel=\"noopener noreferrer\">geelongaustralia.com.au<\/a> or phone 5272 5272.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE CITY of Greater Geelong council has completed Stage 2 of the Portarlington Recreation Reserve (PRR) 10-year masterplan, after six weeks of community consultation running April-June. The city sought feedback from the community and stakeholders for a new master plan (set to replace the 2011 version) addressing the increased pressure on local infrastructure due to [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":71,"featured_media":33095,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-33094","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stage two complete for Portarlington reserve - Geelong Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stage two complete for Portarlington reserve - Geelong Times\" \/>\n<meta property=\"og:description\" content=\"THE CITY of Greater Geelong council has completed Stage 2 of the Portarlington Recreation Reserve (PRR) 10-year masterplan, after six weeks of community consultation running April-June. The city sought feedback from the community and stakeholders for a new master plan (set to replace the 2011 version) addressing the increased pressure on local infrastructure due to [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/\" \/>\n<meta property=\"og:site_name\" content=\"Geelong Times\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-01T14:47:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-02T02:44:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-content\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1676\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jessica Nicol\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jessica Nicol\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/\"},\"author\":{\"name\":\"Jessica Nicol\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/31b3cb903716a4fa6f4e29662cea2070\"},\"headline\":\"Stage two complete for Portarlington reserve\",\"datePublished\":\"2020-07-01T14:47:18+00:00\",\"dateModified\":\"2020-07-02T02:44:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/\"},\"wordCount\":478,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/07\\\/Portarlington-RR-May-8-e1593582519812.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/\",\"name\":\"Stage two complete for Portarlington reserve - Geelong Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/07\\\/Portarlington-RR-May-8-e1593582519812.jpg\",\"datePublished\":\"2020-07-01T14:47:18+00:00\",\"dateModified\":\"2020-07-02T02:44:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/07\\\/Portarlington-RR-May-8-e1593582519812.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/07\\\/Portarlington-RR-May-8-e1593582519812.jpg\",\"width\":1676,\"height\":630,\"caption\":\"Stage 2 of the City of greater Geelong\u2019s 10-year Master Plan for the Portarlington Recreation Reserve is now closed after six weeks of community consultation. Photo: SCOTT CRABTREE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/stage-two-portarlington-reserve\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stage two complete for Portarlington reserve\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"name\":\"Geelong Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\",\"name\":\"Geelong Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"width\":248,\"height\":37,\"caption\":\"Geelong Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/31b3cb903716a4fa6f4e29662cea2070\",\"name\":\"Jessica Nicol\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g\",\"caption\":\"Jessica Nicol\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/author\\\/jessicanicol\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stage two complete for Portarlington reserve - Geelong Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/","og_locale":"en_US","og_type":"article","og_title":"Stage two complete for Portarlington reserve - Geelong Times","og_description":"THE CITY of Greater Geelong council has completed Stage 2 of the Portarlington Recreation Reserve (PRR) 10-year masterplan, after six weeks of community consultation running April-June. The city sought feedback from the community and stakeholders for a new master plan (set to replace the 2011 version) addressing the increased pressure on local infrastructure due to [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/","og_site_name":"Geelong Times","article_published_time":"2020-07-01T14:47:18+00:00","article_modified_time":"2020-07-02T02:44:03+00:00","og_image":[{"width":1676,"height":630,"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-content\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg","type":"image\/jpeg"}],"author":"Jessica Nicol","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jessica Nicol","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/"},"author":{"name":"Jessica Nicol","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/31b3cb903716a4fa6f4e29662cea2070"},"headline":"Stage two complete for Portarlington reserve","datePublished":"2020-07-01T14:47:18+00:00","dateModified":"2020-07-02T02:44:03+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/"},"wordCount":478,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/","name":"Stage two complete for Portarlington reserve - Geelong Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg","datePublished":"2020-07-01T14:47:18+00:00","dateModified":"2020-07-02T02:44:03+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/07\/Portarlington-RR-May-8-e1593582519812.jpg","width":1676,"height":630,"caption":"Stage 2 of the City of greater Geelong\u2019s 10-year Master Plan for the Portarlington Recreation Reserve is now closed after six weeks of community consultation. Photo: SCOTT CRABTREE"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/stage-two-portarlington-reserve\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/"},{"@type":"ListItem","position":2,"name":"Stage two complete for Portarlington reserve"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","name":"Geelong Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization","name":"Geelong Times","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","width":248,"height":37,"caption":"Geelong Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/31b3cb903716a4fa6f4e29662cea2070","name":"Jessica Nicol","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ca19cdbbc777bffb56b3d825ba3243d5c23d1be8d90c7d7d7f4f236282f5f0d4?s=96&d=mm&r=g","caption":"Jessica Nicol"},"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/author\/jessicanicol\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/33094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/users\/71"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/comments?post=33094"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/33094\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media\/33095"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media?parent=33094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/categories?post=33094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/tags?post=33094"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/post_folder?post=33094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}