	{"id":38577,"date":"2021-04-22T16:49:48","date_gmt":"2021-04-22T05:49:48","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?p=38577"},"modified":"2021-04-26T12:03:14","modified_gmt":"2021-04-26T01:03:14","slug":"major-lara-development-makes-a-second-attempt","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/","title":{"rendered":"Major Lara development makes a second attempt"},"content":{"rendered":"<p>AN APPLICATION for a major development in Geelong&#8217;s north has been re-lodged less than five months after initial plans were rejected by VCAT.<\/p>\n<p>Oreana Property Group first lodged its proposal to develop Lara&#8217;s growing residential area in December 2019, when it submitted plans to build 89 new dwellings in the Manzeene Village.<\/p>\n<p>The projected $11.2 million dollar project received 53 public objections raising concerns over the density of the development.<\/p>\n<p>These concerns were later shared by VCAT, who dismissed the application in November 2020.<\/p>\n<p>Under the amended document the proposed village would now feature 84 dwellings at an estimated cost of $10.3 million.<\/p>\n<p>The proposed site is 21,950 square metres and borders Patullos Road, O&#8217;Hallorans Road and Manzeene Avenue.<\/p>\n<p>In the application it states the current use of land is occupied by two temporary buildings associated with residential sales but otherwise vacant with minimal existing vegetation.<\/p>\n<p>The previous plans were not supported by the City of Greater Geelong or the tribunal with the application stating, &#8220;Council officers decided to support the application subject to conditions, however the application was not supported at a Planning Committee Meeting&#8221;.<\/p>\n<p>&#8220;More recently, the application was heard by the Tribunal under Section 79 of the Planning and Environment Act (1987), and no permit was granted.&#8221;<\/p>\n<p>The tribunal raised concerns over the continuous built form, lack of landscape with minimal use of native vegetation as well as a lack of transition in lot sizes.<\/p>\n<p>Planning documents have claimed to address the key issues raised in last year&#8217;s tribunal ruling by reducing the number of dwellings per &#8216;pod&#8217; to four as well as the inclusion of a landscape buffer with communal open spaces and native and Indigenous planting.<\/p>\n<p>In total 79-single storey dwellings have been proposed with the exception of four double storey houses to be located on the comer of Patullos and O&#8217;Hallorans Road.<\/p>\n<p>The revised proposal further compromises of 41 two-bedroom, 31 three-bedroom and 12 four-bedroom homes on lot sizes ranging from 118sq m to 283sq m.<\/p>\n<p>&#8220;The proposed dwellings are either attached or semi-attached and is contemporary in style, comprising hipped roofs with materials and finishes drawn from a neutral palette including face brickwork, rendered finish, Weathertex cladding,&#8221; the proposal said.<\/p>\n<p>A communal open space has been included in the redevelopment with plans to include a vegetable garden and seating areas.<\/p>\n<p>The public will have until May 1 to lodge submissions in response to the revised plans.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AN APPLICATION for a major development in Geelong&#8217;s north has been re-lodged less than five months after initial plans were rejected by VCAT. Oreana Property Group first lodged its proposal to develop Lara&#8217;s growing residential area in December 2019, when it submitted plans to build 89 new dwellings in the Manzeene Village. The projected $11.2 [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":176,"featured_media":38578,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-38577","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Major Lara development makes a second attempt - Geelong Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Major Lara development makes a second attempt - Geelong Times\" \/>\n<meta property=\"og:description\" content=\"AN APPLICATION for a major development in Geelong&#8217;s north has been re-lodged less than five months after initial plans were rejected by VCAT. Oreana Property Group first lodged its proposal to develop Lara&#8217;s growing residential area in December 2019, when it submitted plans to build 89 new dwellings in the Manzeene Village. The projected $11.2 [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/\" \/>\n<meta property=\"og:site_name\" content=\"Geelong Times\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-22T05:49:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-04-26T01:03:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-content\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Georgia Holloway\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Georgia Holloway\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/\"},\"author\":{\"name\":\"Georgia Holloway\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/1c9f6455a0b9c3da7d9ed693000cacfc\"},\"headline\":\"Major Lara development makes a second attempt\",\"datePublished\":\"2021-04-22T05:49:48+00:00\",\"dateModified\":\"2021-04-26T01:03:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/\"},\"wordCount\":401,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2021\\\/04\\\/Untitleddesign42_91192.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/\",\"name\":\"Major Lara development makes a second attempt - Geelong Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2021\\\/04\\\/Untitleddesign42_91192.png\",\"datePublished\":\"2021-04-22T05:49:48+00:00\",\"dateModified\":\"2021-04-26T01:03:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2021\\\/04\\\/Untitleddesign42_91192.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2021\\\/04\\\/Untitleddesign42_91192.png\",\"width\":1200,\"height\":630,\"caption\":\"A total of 84 dwellings have been proposed on the Manzeene Village location following failed attempts to develop the land five months ago.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/major-lara-development-makes-a-second-attempt\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Major Lara development makes a second attempt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"name\":\"Geelong Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\",\"name\":\"Geelong Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"width\":248,\"height\":37,\"caption\":\"Geelong Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/1c9f6455a0b9c3da7d9ed693000cacfc\",\"name\":\"Georgia Holloway\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g\",\"caption\":\"Georgia Holloway\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/author\\\/georgiaholloway\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Major Lara development makes a second attempt - Geelong Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/","og_locale":"en_US","og_type":"article","og_title":"Major Lara development makes a second attempt - Geelong Times","og_description":"AN APPLICATION for a major development in Geelong&#8217;s north has been re-lodged less than five months after initial plans were rejected by VCAT. Oreana Property Group first lodged its proposal to develop Lara&#8217;s growing residential area in December 2019, when it submitted plans to build 89 new dwellings in the Manzeene Village. The projected $11.2 [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/","og_site_name":"Geelong Times","article_published_time":"2021-04-22T05:49:48+00:00","article_modified_time":"2021-04-26T01:03:14+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-content\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png","type":"image\/png"}],"author":"Georgia Holloway","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Georgia Holloway","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/"},"author":{"name":"Georgia Holloway","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/1c9f6455a0b9c3da7d9ed693000cacfc"},"headline":"Major Lara development makes a second attempt","datePublished":"2021-04-22T05:49:48+00:00","dateModified":"2021-04-26T01:03:14+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/"},"wordCount":401,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/","name":"Major Lara development makes a second attempt - Geelong Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png","datePublished":"2021-04-22T05:49:48+00:00","dateModified":"2021-04-26T01:03:14+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2021\/04\/Untitleddesign42_91192.png","width":1200,"height":630,"caption":"A total of 84 dwellings have been proposed on the Manzeene Village location following failed attempts to develop the land five months ago."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/major-lara-development-makes-a-second-attempt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/"},{"@type":"ListItem","position":2,"name":"Major Lara development makes a second attempt"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","name":"Geelong Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization","name":"Geelong Times","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","width":248,"height":37,"caption":"Geelong Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/1c9f6455a0b9c3da7d9ed693000cacfc","name":"Georgia Holloway","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/358c89a828f685d53f3ca86592628fa7dff55378fbd8d919907d16087a7122a0?s=96&d=mm&r=g","caption":"Georgia Holloway"},"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/author\/georgiaholloway\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/38577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/users\/176"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/comments?post=38577"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/38577\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media\/38578"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media?parent=38577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/categories?post=38577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/tags?post=38577"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/post_folder?post=38577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}