	{"id":49834,"date":"2022-06-02T05:00:40","date_gmt":"2022-06-01T19:00:40","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/"},"modified":"2022-06-02T14:31:40","modified_gmt":"2022-06-02T04:31:40","slug":"enormous-pipeline-of-work-to-complete-across-the-construction-sector","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/","title":{"rendered":"Enormous pipeline of work to complete across the construction sector"},"content":{"rendered":"<h3>The ABS has recently released preliminary data on construction work undertaken across all states and territories for the March quarter of 2022.<\/h3>\n<p>Commenting on the new data, HIA economist Tom Devitt noted that construction work done on new houses in the March 2022 quarter was down by 3.5 per cent on the previous quarter.<\/p>\n<p>\u201cActivity early in the year was held back by the staff absences associated with the COVID-19 Omicron outbreak and the extended leave many Australians took over the summer holiday period,\u201d Mr Devitt added.<\/p>\n<p>\u201cThere is still an enormous pipeline of work to complete across all regions.\u201d<\/p>\n<p>The data also shows that at the end of 2021, there were 75.7 per cent more detached homes under construction than pre-pandemic.<\/p>\n<p>The volume of detached homes approved but not yet commenced was also at a record high.<\/p>\n<p>Mr Devitt said that these figures represent not just the HomeBuilder boom, but also the ongoing demand for housing during the pandemic as Australians sought more space and amenity in their living environment.<\/p>\n<p>\u201cAs highlighted in HIA\u2019s latest Outlook Report, released yesterday, this strong ongoing demand has occurred at the same time as significant constraints on materials, land and labour.<\/p>\n<p>\u201cThis has resulted in rapid increases in the cost of construction and extended construction timeframes.<\/p>\n<p>\u201cThis will sustain elevated levels of building activity through to December 2023 and beyond, even with interest rates on the rise.\u201d<\/p>\n<p>The value of multi-unit construction increased by 2.6 per cent in the March 2022 quarter, though this is still well down from the peak of the previous cycle.<\/p>\n<p>\u201cAffordability issues in the detached market, as well as an acute rental shortage and the return of overseas migrants, students and tourists, should increasingly shift demand back towards higher density living,\u201d Mr Devitt said.<\/p>\n<p>\u201cWith detached home building remaining at capacity during 2023 and the volume of multi-unit commencements increasing, the shortage of building materials, land and labour will continue to be the main pinch point for the industry.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The ABS has recently released preliminary data on construction work undertaken across all states and territories for the March quarter of 2022. Commenting on the new data, HIA economist Tom Devitt noted that construction work done on new houses in the March 2022 quarter was down by 3.5 per cent on the previous quarter. \u201cActivity [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":29,"featured_media":49835,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[19],"tags":[],"post_folder":[],"class_list":["post-49834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-real-estate"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Enormous pipeline of work to complete across the construction sector - Geelong Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Enormous pipeline of work to complete across the construction sector - Geelong Times\" \/>\n<meta property=\"og:description\" content=\"The ABS has recently released preliminary data on construction work undertaken across all states and territories for the March quarter of 2022. Commenting on the new data, HIA economist Tom Devitt noted that construction work done on new houses in the March 2022 quarter was down by 3.5 per cent on the previous quarter. \u201cActivity [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/\" \/>\n<meta property=\"og:site_name\" content=\"Geelong Times\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-01T19:00:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-02T04:31:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg?_t=1654144300\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dean Webster\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dean Webster\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/\"},\"author\":{\"name\":\"Dean Webster\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/d279ea712d198c6ed08eb420e88e6ba8\"},\"headline\":\"Enormous pipeline of work to complete across the construction sector\",\"datePublished\":\"2022-06-01T19:00:40+00:00\",\"dateModified\":\"2022-06-02T04:31:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/\"},\"wordCount\":333,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/06\\\/Constructiontimber_18165.jpeg\",\"articleSection\":[\"Real Estate\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/\",\"name\":\"Enormous pipeline of work to complete across the construction sector - Geelong Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/06\\\/Constructiontimber_18165.jpeg\",\"datePublished\":\"2022-06-01T19:00:40+00:00\",\"dateModified\":\"2022-06-02T04:31:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/06\\\/Constructiontimber_18165.jpeg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/06\\\/Constructiontimber_18165.jpeg\",\"width\":1024,\"height\":576,\"caption\":\"Strong ongoing demand has occurred at the same time as significant constraints on materials, land and labour.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/real-estate\\\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Enormous pipeline of work to complete across the construction sector\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"name\":\"Geelong Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\",\"name\":\"Geelong Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"width\":248,\"height\":37,\"caption\":\"Geelong Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/d279ea712d198c6ed08eb420e88e6ba8\",\"name\":\"Dean Webster\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g\",\"caption\":\"Dean Webster\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/author\\\/deanwebster\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Enormous pipeline of work to complete across the construction sector - Geelong Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/","og_locale":"en_US","og_type":"article","og_title":"Enormous pipeline of work to complete across the construction sector - Geelong Times","og_description":"The ABS has recently released preliminary data on construction work undertaken across all states and territories for the March quarter of 2022. Commenting on the new data, HIA economist Tom Devitt noted that construction work done on new houses in the March 2022 quarter was down by 3.5 per cent on the previous quarter. \u201cActivity [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/","og_site_name":"Geelong Times","article_published_time":"2022-06-01T19:00:40+00:00","article_modified_time":"2022-06-02T04:31:40+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg?_t=1654144300","type":"image\/jpeg"}],"author":"Dean Webster","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dean Webster","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/"},"author":{"name":"Dean Webster","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/d279ea712d198c6ed08eb420e88e6ba8"},"headline":"Enormous pipeline of work to complete across the construction sector","datePublished":"2022-06-01T19:00:40+00:00","dateModified":"2022-06-02T04:31:40+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/"},"wordCount":333,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg","articleSection":["Real Estate"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/","name":"Enormous pipeline of work to complete across the construction sector - Geelong Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg","datePublished":"2022-06-01T19:00:40+00:00","dateModified":"2022-06-02T04:31:40+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/06\/Constructiontimber_18165.jpeg","width":1024,"height":576,"caption":"Strong ongoing demand has occurred at the same time as significant constraints on materials, land and labour."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/real-estate\/enormous-pipeline-of-work-to-complete-across-the-construction-sector\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/"},{"@type":"ListItem","position":2,"name":"Enormous pipeline of work to complete across the construction sector"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","name":"Geelong Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization","name":"Geelong Times","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","width":248,"height":37,"caption":"Geelong Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/d279ea712d198c6ed08eb420e88e6ba8","name":"Dean Webster","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dfa921400e30aef5231e3936f8a07f8223ca52451fc6585a1c0634f658889bac?s=96&d=mm&r=g","caption":"Dean Webster"},"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/author\/deanwebster\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/49834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/comments?post=49834"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/49834\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media\/49835"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media?parent=49834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/categories?post=49834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/tags?post=49834"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/post_folder?post=49834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}