	{"id":55687,"date":"2022-08-26T04:00:00","date_gmt":"2022-08-25T18:00:00","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?p=55687"},"modified":"2022-08-24T14:57:37","modified_gmt":"2022-08-24T04:57:37","slug":"new-intersection-station-revealed-for-south-geelong","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/","title":{"rendered":"New intersection, station revealed for South Geelong"},"content":{"rendered":"<p>NEW-LOOK South Geelong rail infrastructure has been unveiled in draft plans, with the suburb&#8217;s station and Fyans Street rail crossing in line for upgrades.<\/p>\n<p>The federal and state governments are delivering the projects as part of the <a href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/rail-duplication-is-go\/\">South Geelong to Waurn Ponds Duplication<\/a> project.<\/p>\n<p>Major works on the line are due to start later this year with construction to finish by the end of 2024.<\/p>\n<p>A planned rail bridge at Fyans Street to remove the existing level crossing and five-way roundabout at Wood and Carr streets headlines the project.<\/p>\n<p>The governments say its new bridge will simplify the intersection and improve safety and traffic flow at the notorious intersection for the 14,000 vehicles that use the road daily.<\/p>\n<p>The planned new intersection also has greater separation from nearby residences than in initial plans, following <a href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/rail-project-designs-unveiled\/\">earlier feedback<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_55704\" aria-describedby=\"caption-attachment-55704\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-55704\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1-300x190.png\" alt=\"\" width=\"600\" height=\"380\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1-300x190.png 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1-1024x649.png 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1-600x380.png 600w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1-768x486.png 768w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-1.png 1200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-55704\" class=\"wp-caption-text\">A rail bridge view from Fyans Street. Photos: SUPPLIED<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Meanwhile, South Geelong Station will also get a redesign that includes a second rail platform to accommodate the duplicated track, with the platforms to be linked with an accessible pedestrian overpass.<\/p>\n<p>An improved carpark and landscaped forecourts are also part of the plans.<\/p>\n<p>The government also indicated &#8220;changes to traffic flow&#8221; in the area, and plans appear to show a rail bridge that would remove a Yarra Street level crossing.<\/p>\n<p>The duplication plan will also create two-way rail flow between South Geelong and Waurn Ponds \u2013 except the Breakwater river bridge \u2013 to boost service frequency through Geelong.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_55705\" aria-describedby=\"caption-attachment-55705\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-55705\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2-300x190.png\" alt=\"\" width=\"600\" height=\"380\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2-300x190.png 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2-1024x649.png 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2-600x380.png 600w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2-768x486.png 768w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-embedded-2.png 1200w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-55705\" class=\"wp-caption-text\">A proposed revamp of South Geelong Station. Photos: SUPPLIED<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Federal and state MPs said the transport project could be transformative for Geelong.<\/p>\n<p>&#8220;I&#8217;m pleased to see that this design incorporates safety as well as reliability for our local road and rail traffic in line with community feedback,&#8221; Corio MP Richard Marles said. &#8220;As well as an improved design for road and rail traffic, these plans also ensure the safety of pedestrians and cyclists in the area.&#8221;<\/p>\n<p>Deputy Premier and Transport Infrastructure Minister Jacinta Allen said the &#8220;congestion-busting project&#8221; was crucial for the growing Geelong region.<\/p>\n<p>&#8220;Removing the dangerous and congested level crossings at Fyans Street will boost traffic flow for the thousands of locals and visitors that travel through it every day,&#8221; she said.<\/p>\n<p>Geelong MP Christine Couzens encouraged locals to continue having their say, after more than 500 people contributed to a first consultation round.<\/p>\n<p>Full concept designs and feedback for the plans is available at the Victoria&#8217;s Big Build <a href=\"http:\/\/engage.vic.gov.au\/south-geelong-station-and-fyans-street-level-crossing-consultation\">website.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW-LOOK South Geelong rail infrastructure has been unveiled in draft plans, with the suburb&#8217;s station and Fyans Street rail crossing in line for upgrades. The federal and state governments are delivering the projects as part of the South Geelong to Waurn Ponds Duplication project. Major works on the line are due to start later this [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":195,"featured_media":55706,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-55687","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New intersection, station revealed for South Geelong - Geelong Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New intersection, station revealed for South Geelong - Geelong Times\" \/>\n<meta property=\"og:description\" content=\"NEW-LOOK South Geelong rail infrastructure has been unveiled in draft plans, with the suburb&#8217;s station and Fyans Street rail crossing in line for upgrades. The federal and state governments are delivering the projects as part of the South Geelong to Waurn Ponds Duplication project. Major works on the line are due to start later this [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/\" \/>\n<meta property=\"og:site_name\" content=\"Geelong Times\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-25T18:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Billy Higgins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Billy Higgins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/\"},\"author\":{\"name\":\"Billy Higgins\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\"},\"headline\":\"New intersection, station revealed for South Geelong\",\"datePublished\":\"2022-08-25T18:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/\"},\"wordCount\":428,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/08\\\/GT-Fyans-St-feature.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/\",\"name\":\"New intersection, station revealed for South Geelong - Geelong Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/08\\\/GT-Fyans-St-feature.png\",\"datePublished\":\"2022-08-25T18:00:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/08\\\/GT-Fyans-St-feature.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2022\\\/08\\\/GT-Fyans-St-feature.png\",\"width\":1200,\"height\":630,\"caption\":\"The state and federal government have unveiled an idea to revamp a congested Fyans Street intersection and remove its boom gates. Photos: SUPPLIED\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/news\\\/new-intersection-station-revealed-for-south-geelong\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New intersection, station revealed for South Geelong\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"name\":\"Geelong Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#organization\",\"name\":\"Geelong Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/21\\\/2020\\\/09\\\/times_logo_1.png\",\"width\":248,\"height\":37,\"caption\":\"Geelong Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\",\"name\":\"Billy Higgins\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g\",\"caption\":\"Billy Higgins\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/geelongtimes\\\/author\\\/billyhiggins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New intersection, station revealed for South Geelong - Geelong Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/","og_locale":"en_US","og_type":"article","og_title":"New intersection, station revealed for South Geelong - Geelong Times","og_description":"NEW-LOOK South Geelong rail infrastructure has been unveiled in draft plans, with the suburb&#8217;s station and Fyans Street rail crossing in line for upgrades. The federal and state governments are delivering the projects as part of the South Geelong to Waurn Ponds Duplication project. Major works on the line are due to start later this [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/","og_site_name":"Geelong Times","article_published_time":"2022-08-25T18:00:00+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png","type":"image\/png"}],"author":"Billy Higgins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Billy Higgins","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/"},"author":{"name":"Billy Higgins","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/3238e894a9405429473101b410554085"},"headline":"New intersection, station revealed for South Geelong","datePublished":"2022-08-25T18:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/"},"wordCount":428,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/","name":"New intersection, station revealed for South Geelong - Geelong Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png","datePublished":"2022-08-25T18:00:00+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2022\/08\/GT-Fyans-St-feature.png","width":1200,"height":630,"caption":"The state and federal government have unveiled an idea to revamp a congested Fyans Street intersection and remove its boom gates. Photos: SUPPLIED"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/news\/new-intersection-station-revealed-for-south-geelong\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/"},{"@type":"ListItem","position":2,"name":"New intersection, station revealed for South Geelong"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","name":"Geelong Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#organization","name":"Geelong Times","url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/21\/2020\/09\/times_logo_1.png","width":248,"height":37,"caption":"Geelong Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/#\/schema\/person\/3238e894a9405429473101b410554085","name":"Billy Higgins","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6bf7018ba34dd92291111c5a4baf160b5f6fc22a820ced157d362424c8a373ad?s=96&d=mm&r=g","caption":"Billy Higgins"},"url":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/author\/billyhiggins\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/55687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/users\/195"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/comments?post=55687"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/posts\/55687\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media\/55706"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/media?parent=55687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/categories?post=55687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/tags?post=55687"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/geelongtimes\/wp-json\/wp\/v2\/post_folder?post=55687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}