	{"id":112982,"date":"2023-08-22T04:17:07","date_gmt":"2023-08-21T18:17:07","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?p=112982"},"modified":"2023-08-17T10:30:16","modified_gmt":"2023-08-17T00:30:16","slug":"bridge-build-under-way","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/","title":{"rendered":"Bridge build under way"},"content":{"rendered":"<p>ROADS authorities have kicked off a construction project that will replace a bridge over Wye River on the Great Ocean Road.<\/p>\n<p>As part of preliminary work, Regional Roads Victoria (RRV) will remove water tanks in the Foreshore Caravan Park and one located behind the caretaker&#8217;s building.<\/p>\n<p>Reduced speed limits will be in place, but no lane closures.<\/p>\n<figure id=\"attachment_112986\" aria-describedby=\"caption-attachment-112986\" style=\"width: 522px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-112986\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverfootpath-Aug_81140.jpg?_t=1692231962\" alt=\"\" width=\"522\" height=\"346\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverfootpath-Aug_81140.jpg 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverfootpath-Aug_81140-300x199.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverfootpath-Aug_81140-768x509.jpg 768w\" sizes=\"auto, (max-width: 522px) 100vw, 522px\" \/><figcaption id=\"caption-attachment-112986\" class=\"wp-caption-text\">Artist&#8217;s impressions a new bridge at Wye River. Photos: SUPPLIED<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>The traffic changes will end once the water tanks are removed, expected to be towards the end of this next month, to enable two lanes of traffic to remain open during summer months.<\/p>\n<p>From April next year RRV will begin demolishing and replacing the bridge half at a time, to enable one lane to remain open.<\/p>\n<p>The replacement will include building a retaining wall on the ocean side and widening of the road on both sides of the bridge.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-112983 \" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverBridge-Aug22_81112.jpg?_t=1692231962\" alt=\"\" width=\"506\" height=\"336\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverBridge-Aug22_81112.jpg 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverBridge-Aug22_81112-300x199.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverBridge-Aug22_81112-768x509.jpg 768w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/WyeRiverBridge-Aug22_81112-272x182.jpg 272w\" sizes=\"auto, (max-width: 506px) 100vw, 506px\" \/><\/p>\n<p>RRV said its staged approach intended to create as little disturbance as possible for residents and visitors.<\/p>\n<p>&#8220;Our priority is to improve safety and access on the Great Ocean Road by replacing the bridge at Wye River, with the least possible disruption to the community and local business.<\/p>\n<p>&#8220;To maintain two-lane, two-way traffic during the peak tourist season, we&#8217;ve determined that construction over two years will provide the best possible outcomes.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ROADS authorities have kicked off a construction project that will replace a bridge over Wye River on the Great Ocean Road. As part of preliminary work, Regional Roads Victoria (RRV) will remove water tanks in the Foreshore Caravan Park and one located behind the caretaker&#8217;s building. Reduced speed limits will be in place, but no [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":195,"featured_media":112989,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-112982","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bridge build under way - Surf Coast Times<\/title>\n<meta name=\"description\" content=\"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bridge build under way - Surf Coast Times\" \/>\n<meta property=\"og:description\" content=\"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/\" \/>\n<meta property=\"og:site_name\" content=\"Surf Coast Times\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-21T18:17:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Billy Higgins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Billy Higgins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/\"},\"author\":{\"name\":\"Billy Higgins\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\"},\"headline\":\"Bridge build under way\",\"datePublished\":\"2023-08-21T18:17:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/\"},\"wordCount\":232,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2023\\\/08\\\/FeatureImage-43.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/\",\"name\":\"Bridge build under way - Surf Coast Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2023\\\/08\\\/FeatureImage-43.png\",\"datePublished\":\"2023-08-21T18:17:07+00:00\",\"description\":\"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2023\\\/08\\\/FeatureImage-43.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2023\\\/08\\\/FeatureImage-43.png\",\"width\":1200,\"height\":630,\"caption\":\"ROADS authorities have kicked off a construction project that will replace a bridge over Wye River on the Great Ocean Road.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/bridge-build-under-way\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bridge build under way\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"name\":\"Surf Coast Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\",\"name\":\"Surf Coast Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":350,\"height\":38,\"caption\":\"Surf Coast Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/3238e894a9405429473101b410554085\",\"name\":\"Billy Higgins\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/author\\\/billyhiggins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bridge build under way - Surf Coast Times","description":"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/","og_locale":"en_US","og_type":"article","og_title":"Bridge build under way - Surf Coast Times","og_description":"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.","og_url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/","og_site_name":"Surf Coast Times","article_published_time":"2023-08-21T18:17:07+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png","type":"image\/png"}],"author":"Billy Higgins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Billy Higgins","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/"},"author":{"name":"Billy Higgins","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/3238e894a9405429473101b410554085"},"headline":"Bridge build under way","datePublished":"2023-08-21T18:17:07+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/"},"wordCount":232,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/","name":"Bridge build under way - Surf Coast Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png","datePublished":"2023-08-21T18:17:07+00:00","description":"Wye River bridge replacement project begins, with water tanks to be removed first. Demolition and replacement of the bridge will begin in April 2024, with one lane of traffic to remain open.","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2023\/08\/FeatureImage-43.png","width":1200,"height":630,"caption":"ROADS authorities have kicked off a construction project that will replace a bridge over Wye River on the Great Ocean Road."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/bridge-build-under-way\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/"},{"@type":"ListItem","position":2,"name":"Bridge build under way"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","name":"Surf Coast Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization","name":"Surf Coast Times","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","width":350,"height":38,"caption":"Surf Coast Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/3238e894a9405429473101b410554085","name":"Billy Higgins","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/author\/billyhiggins\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/112982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/users\/195"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/comments?post=112982"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/112982\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media\/112989"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media?parent=112982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/categories?post=112982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/tags?post=112982"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/post_folder?post=112982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}