	{"id":15758,"date":"2018-08-15T09:53:15","date_gmt":"2018-08-14T23:53:15","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?p=15758"},"modified":"2018-08-16T22:18:13","modified_gmt":"2018-08-16T12:18:13","slug":"community-update-power-station-decommissioning-august-16-2018","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/","title":{"rendered":"Community Update: Power station decommissioning &#8211; August 16, 2018"},"content":{"rendered":"<p><strong>As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure.<\/strong><\/p>\n<p>Further to last week\u2019s Community Update (Surf Coast Times, 9 August), and as presented at the Alcoa Community Consultation Network (CCN) meeting on 13 August, Alcoa is continuing to work with the principal contractor to plan for the demolition of the remaining power station structure.<\/p>\n<p>The detailed analysis to determine why the structure only partially collapsed has been completed and is informing the method for the future demolition.<\/p>\n<p>The principal contractor is currently finalising contracts with a suitably qualified subcontractor to undertake the demolition. The subcontractor has, through experience gained from a similar situation, developed advanced methodologies that will be used on this project.<\/p>\n<p>A range of different demolition options are being considered and each option is being analysed and risk assessed.<\/p>\n<p>It is currently expected that the preferred option will include the use of explosives placed via a combination of remote controlled technologies and standard manual application techniques.<\/p>\n<p>It is anticipated that the demolition activity will occur in September or October. The ultimate timing will be subject to final safety checks and wind direction.<\/p>\n<p>Alcoa is committed to keeping the community informed about the demolition activity. Dropin information sessions are being planned to enable interested community members to speak directly with Alcoa representatives. Information will also continue to be provided via updates in the Surf Coast Times and written correspondence to Anglesea residents and businesses.<\/p>\n<p>While the planning for the demolition is ongoing, Alcoa remains committed to ensuring the continued safety of onsite personnel and the community. Monitoring of the power station structure continues to confirm it is stable.<\/p>\n<p>Air monitoring remains in place. No airborne asbestos fibres have been detected above the Occupational Health and Safety Regulations 2007 asbestos exposure standard. As stated previously, the demolition occurred following twelve-month asbestos removal program, a process regulated by Worksafe Victoria.<\/p>\n<p>The safety exclusion zone also remains in place and is monitored by security officers and video surveillance 24 hours per day. Worksafe Victoria and EPA Victoria continue to be closely informed about activities at the site.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community Update (Surf Coast [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":26,"featured_media":15738,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-15758","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times\" \/>\n<meta property=\"og:description\" content=\"As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community Update (Surf Coast [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/\" \/>\n<meta property=\"og:site_name\" content=\"Surf Coast Times\" \/>\n<meta property=\"article:author\" content=\"jamespetertaylor\" \/>\n<meta property=\"article:published_time\" content=\"2018-08-14T23:53:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-08-16T12:18:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"770\" \/>\n\t<meta property=\"og:image:height\" content=\"430\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@notthatjt\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\"},\"headline\":\"Community Update: Power station decommissioning &#8211; August 16, 2018\",\"datePublished\":\"2018-08-14T23:53:15+00:00\",\"dateModified\":\"2018-08-16T12:18:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/\"},\"wordCount\":387,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2018\\\/08\\\/The-Anglesea-power-station.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/\",\"name\":\"Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2018\\\/08\\\/The-Anglesea-power-station.jpg\",\"datePublished\":\"2018-08-14T23:53:15+00:00\",\"dateModified\":\"2018-08-16T12:18:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2018\\\/08\\\/The-Anglesea-power-station.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2018\\\/08\\\/The-Anglesea-power-station.jpg\",\"width\":770,\"height\":430,\"caption\":\"The Anglesea power station was only partially demolished on May 30.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/community-update-power-station-decommissioning-august-16-2018\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Community Update: Power station decommissioning &#8211; August 16, 2018\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"name\":\"Surf Coast Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\",\"name\":\"Surf Coast Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":350,\"height\":38,\"caption\":\"Surf Coast Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\",\"name\":\"James Taylor\",\"description\":\"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).\",\"sameAs\":[\"jamespetertaylor\",\"https:\\\/\\\/x.com\\\/@notthatjt\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/author\\\/jamestaylor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/","og_locale":"en_US","og_type":"article","og_title":"Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times","og_description":"As part of Alcoa of Australia\u2019s decommissioning of the Anglesea power station and mine, the main power station building was scheduled to be felled using controlled explosives on 30 May. The demolition activity, which was safely executed, did not result in the complete collapse of the structure. Further to last week\u2019s Community Update (Surf Coast [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/","og_site_name":"Surf Coast Times","article_author":"jamespetertaylor","article_published_time":"2018-08-14T23:53:15+00:00","article_modified_time":"2018-08-16T12:18:13+00:00","og_image":[{"width":770,"height":430,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg","type":"image\/jpeg"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_creator":"@notthatjt","twitter_misc":{"Written by":"James Taylor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677"},"headline":"Community Update: Power station decommissioning &#8211; August 16, 2018","datePublished":"2018-08-14T23:53:15+00:00","dateModified":"2018-08-16T12:18:13+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/"},"wordCount":387,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/","name":"Community Update: Power station decommissioning - August 16, 2018 - Surf Coast Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg","datePublished":"2018-08-14T23:53:15+00:00","dateModified":"2018-08-16T12:18:13+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2018\/08\/The-Anglesea-power-station.jpg","width":770,"height":430,"caption":"The Anglesea power station was only partially demolished on May 30."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/community-update-power-station-decommissioning-august-16-2018\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/"},{"@type":"ListItem","position":2,"name":"Community Update: Power station decommissioning &#8211; August 16, 2018"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","name":"Surf Coast Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization","name":"Surf Coast Times","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","width":350,"height":38,"caption":"Surf Coast Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677","name":"James Taylor","description":"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).","sameAs":["jamespetertaylor","https:\/\/x.com\/@notthatjt"],"url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/author\/jamestaylor\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/15758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/comments?post=15758"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/15758\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media\/15738"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media?parent=15758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/categories?post=15758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/tags?post=15758"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/post_folder?post=15758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}