	{"id":174957,"date":"2025-11-23T04:00:00","date_gmt":"2025-11-22T17:00:00","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?p=174957"},"modified":"2025-11-21T14:14:20","modified_gmt":"2025-11-21T03:14:20","slug":"rebuild-starts-on-torquay-beach-ramp-after-year-long-closure","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/","title":{"rendered":"Rebuild starts on Torquay beach ramp after year-long closure"},"content":{"rendered":"<p>A KEY access point to Torquay Surf Beach is on track to reopen by mid-December, as reconstruction on the ramp at the surf lifesaving club gets under way.<\/p>\n<p>The ramp, used by lifesavers to launch rescue vessels and for community access to the main surf break, has been out of action for 12 months, after severe storms and coastal erosion caused significant damage to the seawall, concourse and access structures last spring.<\/p>\n<p>At the time, to prevent further erosion to the seawall, more than 80 rock bags were brought in to reinforce the front of the wall in December.<\/p>\n<figure id=\"attachment_174959\" aria-describedby=\"caption-attachment-174959\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-174959\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Ramp_46523.jpg\" alt=\"\" width=\"600\" height=\"600\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Ramp_46523.jpg 1200w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Ramp_46523-300x300.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Ramp_46523-1024x1024.jpg 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Ramp_46523-768x768.jpg 768w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-174959\" class=\"wp-caption-text\">Construction to replace the damaged beach access ramp began this week.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>It is understood the already compromised beach ramp may have sustained further damage as these works were taking place, with trucks and excavators using the ramp to transport the rock bags onto the beach.<\/p>\n<p>The Great Ocean Road Coast and Parks Authority (GORCAPA) began construction to replace the damaged ramp this week, but the rock bags that line the seawall will remain in place until a long-term solution is finalised.<\/p>\n<p>These works are scheduled for 2026.<\/p>\n<figure id=\"attachment_174960\" aria-describedby=\"caption-attachment-174960\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-174960\" src=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/581537771_1119386610_46519.jpg\" alt=\"\" width=\"600\" height=\"338\" srcset=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/581537771_1119386610_46519.jpg 1200w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/581537771_1119386610_46519-300x169.jpg 300w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/581537771_1119386610_46519-1024x576.jpg 1024w, https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/581537771_1119386610_46519-768x432.jpg 768w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-174960\" class=\"wp-caption-text\">The more than 80 rock bags that line the seawall will remain in place until at least the new year, as a long-term solution is finalised.<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>&#8220;Next year, we&#8217;ll kick off the major repair works for the rest of the damaged seawall,&#8221; GORCAPA chief executive Christine Ferguson said.<\/p>\n<p>&#8220;We understand that this is an important location for the local community and the many visitors who come to the area.&#8221;<\/p>\n<p>Fencing has been installed around the Torquay SLSC building while works on the ramp take place, but pedestrians will still be able to walk around the fenced area along the beach, except at high tide.<\/p>\n<p>The beach access stairs, to the east of the club, which were also damaged in the storm, have recently been rebuilt and will remain open to the public during construction.<\/p>\n<p>Visitors seeking a swim are encouraged to use the nearby Cosy Corner while construction continues.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A KEY access point to Torquay Surf Beach is on track to reopen by mid-December, as reconstruction on the ramp at the surf lifesaving club gets under way. The ramp, used by lifesavers to launch rescue vessels and for community access to the main surf break, has been out of action for 12 months, after [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":216,"featured_media":174962,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-174957","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times<\/title>\n<meta name=\"description\" content=\"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times\" \/>\n<meta property=\"og:description\" content=\"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/\" \/>\n<meta property=\"og:site_name\" content=\"Surf Coast Times\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-22T17:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ellie Claringbold\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ellie Claringbold\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/\"},\"author\":{\"name\":\"Ellie Claringbold\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/32abddd83bad3e2425166905b3e3aaff\"},\"headline\":\"Rebuild starts on Torquay beach ramp after year-long closure\",\"datePublished\":\"2025-11-22T17:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/\"},\"wordCount\":357,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/Newstairs423.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/\",\"name\":\"Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/Newstairs423.jpg\",\"datePublished\":\"2025-11-22T17:00:00+00:00\",\"description\":\"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/Newstairs423.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/Newstairs423.jpg\",\"width\":1200,\"height\":630,\"caption\":\"The beach access stairs, to the east of the club, which were also damaged in the storm, have recently been rebuilt. Photos: SUPPLIED. BELOW: Construction to replace the damaged beach access ramp began this week.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rebuild starts on Torquay beach ramp after year-long closure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"name\":\"Surf Coast Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\",\"name\":\"Surf Coast Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":350,\"height\":38,\"caption\":\"Surf Coast Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/32abddd83bad3e2425166905b3e3aaff\",\"name\":\"Ellie Claringbold\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/author\\\/ellie\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times","description":"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/","og_locale":"en_US","og_type":"article","og_title":"Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times","og_description":"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!","og_url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/","og_site_name":"Surf Coast Times","article_published_time":"2025-11-22T17:00:00+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg","type":"image\/jpeg"}],"author":"Ellie Claringbold","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ellie Claringbold","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/"},"author":{"name":"Ellie Claringbold","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/32abddd83bad3e2425166905b3e3aaff"},"headline":"Rebuild starts on Torquay beach ramp after year-long closure","datePublished":"2025-11-22T17:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/"},"wordCount":357,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/","name":"Rebuild starts on Torquay beach ramp after year-long closure - Surf Coast Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg","datePublished":"2025-11-22T17:00:00+00:00","description":"Rebuilding the crucial Torquay beach ramp is underway after a year-long closure due to storm damage. Access to Surf Beach is expected to reopen by mid-December!","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2025\/11\/Newstairs423.jpg","width":1200,"height":630,"caption":"The beach access stairs, to the east of the club, which were also damaged in the storm, have recently been rebuilt. Photos: SUPPLIED. BELOW: Construction to replace the damaged beach access ramp began this week."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/rebuild-starts-on-torquay-beach-ramp-after-year-long-closure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/"},{"@type":"ListItem","position":2,"name":"Rebuild starts on Torquay beach ramp after year-long closure"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","name":"Surf Coast Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization","name":"Surf Coast Times","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","width":350,"height":38,"caption":"Surf Coast Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/32abddd83bad3e2425166905b3e3aaff","name":"Ellie Claringbold","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/author\/ellie\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/174957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/users\/216"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/comments?post=174957"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/174957\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media\/174962"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media?parent=174957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/categories?post=174957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/tags?post=174957"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/post_folder?post=174957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}