	{"id":57710,"date":"2021-09-06T04:00:35","date_gmt":"2021-09-05T18:00:35","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?p=57710"},"modified":"2021-09-01T14:16:09","modified_gmt":"2021-09-01T04:16:09","slug":"shire-waits-on-engineering-report-about-leisure-time-centre-repairs","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/","title":{"rendered":"Shire waits on engineering report about Leisure Time Centre repairs"},"content":{"rendered":"<p>THE Surf Coast Shire says it cannot and will not fix the problems with Winchelsea&#8217;s Leisure Time Centre (LTC) by itself but is still waiting on an engineering report to determine the best course of action.<\/p>\n<p>Local resident Tony Phelps submitted a petition with 620 signatures to the shire in July urging the council to finish the repairs to the LTC and re-open it as soon as possible, and councillors considered an officers&#8217; report about the petition at their meeting on Tuesday this week.<\/p>\n<p>The facility, on the grounds of the Winchelsea Primary School, has been closed since May after the school noticed further movement in the floorboards from moisture levels underneath the floor and deemed the facility unsafe for use.According to the officers&#8217; report, this was another recurrence of a problem that had tried to be fixed in 2017.<\/p>\n<p>&#8220;It is not within council&#8217;s power to re-open the facility&#8221;, the report states.<\/p>\n<p>&#8220;Council, via its insurer, has sought to assist the school in dealing with building failures in recent years.&#8221;<\/p>\n<p>The report notes the council has supported the school&#8217;s principal in liaising with the Victoria School Building Authority (VSBA), which, in partnership with the school, had commissioned an engineering report to determine the scope and cost of works to re-open the facility, but this has not yet been provided to the shire so &#8220;council&#8217;s options are unclear&#8221;.<\/p>\n<p>&#8220;Officers continue to assist the school to advocate for interim solutions to enable school use, at a minimum, to resume.&#8221;<\/p>\n<p>Petitioners had argued the shire could fix the LTC&#8217;s problems because the building itself and surrounding land was owned by the Department of Education but the shire was responsible for maintenance and upkeep of the facility.<\/p>\n<p>The shire continues to uphold the position there is an existing joint use agreement with the school and the Department of Education and Training about the LTC, which designates a 70\/30 split between the school and the shire for maintenance responsibilities. However, this could change in the future, as this agreement expires in December.<\/p>\n<p>The officers&#8217; report states the repairs to the LTC could range anywhere from &#8220;low complexity&#8221;, costing less than $50,000 and finished within three months; to &#8220;high complexity&#8221;, costing more than $250,000 and finished within 12 months; to &#8220;full redevelopment&#8221;, costing more than $1 million and with an unknown timeframe as &#8220;VSBA commitment to redevelopment is unclear&#8221;.<\/p>\n<p>Cr Adrian Schonfelder said it was a real shame that neither the school nor the broader community could currently use the Winchelsea Leisure Time Centre due to ongoing issues with the flooring.<\/p>\n<p>&#8220;Council has been supporting the school principal in liaising with the VSBA to address the problems, and we currently await the engineering report, which will provide a clearer picture of the issues and the next steps,&#8221; Cr Schonfelder said.<\/p>\n<p>&#8220;We continue to work closely with the school and VSBA with the aim of seeing this important community sport and recreation facility reopened as soon as possible.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE Surf Coast Shire says it cannot and will not fix the problems with Winchelsea&#8217;s Leisure Time Centre (LTC) by itself but is still waiting on an engineering report to determine the best course of action. Local resident Tony Phelps submitted a petition with 620 signatures to the shire in July urging the council to [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":26,"featured_media":57711,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-57710","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times\" \/>\n<meta property=\"og:description\" content=\"THE Surf Coast Shire says it cannot and will not fix the problems with Winchelsea&#8217;s Leisure Time Centre (LTC) by itself but is still waiting on an engineering report to determine the best course of action. Local resident Tony Phelps submitted a petition with 620 signatures to the shire in July urging the council to [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/\" \/>\n<meta property=\"og:site_name\" content=\"Surf Coast Times\" \/>\n<meta property=\"article:author\" content=\"jamespetertaylor\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-05T18:00:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@notthatjt\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\"},\"headline\":\"Shire waits on engineering report about Leisure Time Centre repairs\",\"datePublished\":\"2021-09-05T18:00:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/\"},\"wordCount\":501,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/09\\\/winchelsea-ltc-floo_37660.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/\",\"name\":\"Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/09\\\/winchelsea-ltc-floo_37660.jpg\",\"datePublished\":\"2021-09-05T18:00:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/09\\\/winchelsea-ltc-floo_37660.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/09\\\/winchelsea-ltc-floo_37660.jpg\",\"width\":1024,\"height\":768,\"caption\":\"Temporary expansion floorboards installed late last year at the Leisure Time Centre have moved due to increasing moisture levels underneath the floor.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Shire waits on engineering report about Leisure Time Centre repairs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"name\":\"Surf Coast Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\",\"name\":\"Surf Coast Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":350,\"height\":38,\"caption\":\"Surf Coast Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/2655215c02475fb33ffa43a1c8fe2677\",\"name\":\"James Taylor\",\"description\":\"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).\",\"sameAs\":[\"jamespetertaylor\",\"https:\\\/\\\/x.com\\\/@notthatjt\"],\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/author\\\/jamestaylor\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/","og_locale":"en_US","og_type":"article","og_title":"Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times","og_description":"THE Surf Coast Shire says it cannot and will not fix the problems with Winchelsea&#8217;s Leisure Time Centre (LTC) by itself but is still waiting on an engineering report to determine the best course of action. Local resident Tony Phelps submitted a petition with 620 signatures to the shire in July urging the council to [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/","og_site_name":"Surf Coast Times","article_author":"jamespetertaylor","article_published_time":"2021-09-05T18:00:35+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg","type":"image\/jpeg"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_creator":"@notthatjt","twitter_misc":{"Written by":"James Taylor","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677"},"headline":"Shire waits on engineering report about Leisure Time Centre repairs","datePublished":"2021-09-05T18:00:35+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/"},"wordCount":501,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/","name":"Shire waits on engineering report about Leisure Time Centre repairs - Surf Coast Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg","datePublished":"2021-09-05T18:00:35+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/09\/winchelsea-ltc-floo_37660.jpg","width":1024,"height":768,"caption":"Temporary expansion floorboards installed late last year at the Leisure Time Centre have moved due to increasing moisture levels underneath the floor."},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/shire-waits-on-engineering-report-about-leisure-time-centre-repairs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/"},{"@type":"ListItem","position":2,"name":"Shire waits on engineering report about Leisure Time Centre repairs"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","name":"Surf Coast Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization","name":"Surf Coast Times","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","width":350,"height":38,"caption":"Surf Coast Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/2655215c02475fb33ffa43a1c8fe2677","name":"James Taylor","description":"James\u2019 first job in journalism was at the Bendigo Advertiser, where he held a number of roles, including reporter, sub-editor and arts and features writer. He has also worked for several publications at Fairfax, including the Knox Weekly, Casey Weekly and Pakenham Weekly, and in the UK with the Berkshire Media Group. Raised in Geelong, James has been back in his hometown since 2011 and now lives in Waurn Ponds. Outside of journalism, James divides his time between barracking for the Cats, chasing his two-year-old daughter around, and posting on Twitter (@notthatjt).","sameAs":["jamespetertaylor","https:\/\/x.com\/@notthatjt"],"url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/author\/jamestaylor\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/57710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/users\/26"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/comments?post=57710"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/57710\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media\/57711"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media?parent=57710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/categories?post=57710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/tags?post=57710"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/post_folder?post=57710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}