	{"id":61281,"date":"2021-11-28T04:00:03","date_gmt":"2021-11-27T17:00:03","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?p=61281"},"modified":"2021-11-24T12:33:43","modified_gmt":"2021-11-24T01:33:43","slug":"lights-intersection-delayed-2022","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/","title":{"rendered":"Intersection works not given green light until 2022"},"content":{"rendered":"<p>THE long-awaited traffic lights at an intersection in Torquay North will not start construction until some point in the new year, according to the Surf Coast Shire.<\/p>\n<p>A fully signalised intersection at the junction of the Surf Coast Highway, Coombes Road and the extension of Rosser Boulevard has been part of the planning documents for the Quay 2 estate from the beginning.<\/p>\n<p>The body responsible for building the intersection and installing the lights to create a new entrance to the estate has previously been in dispute.<\/p>\n<p>The task initially fell to Quay 2 developer Intrapac, then the shire took over in February 2019, followed by the shire handing the task back to Intrapac in July 2019.<\/p>\n<p>Following these negotiations, the shire estimated the intersection would be open by late 2021, but earlier this week, the shire\u2019s general manager of governance and infrastructure John Bertoldi said this target would not be met.<\/p>\n<p>\u201cCouncil is working together with Intrapac \u2013 the developer of the Quay 2 estate \u2013 to commence works to install traffic lights on the Coombes Road-Rosser Boulevard-Surf Coast Highway intersection,\u201d he said.<\/p>\n<p>\u201cThe developer is finalising the design of the intersection and has undertaken the undergrounding of some powerlines at the site, in preparation for the road works.<\/p>\n<p>\u201cGiven the intersection is on a Department of Transport-managed road (Surf Coast Highway), the department needs to approve the final plans.<\/p>\n<p>\u201cWe expect tenders for works to go out in the New Year and construction to commence in 2022, with completion in 2023.\u201d<\/p>\n<p>Traffic flow in Torquay North has been a contentious issue in recent years.<\/p>\n<p>The shire set up barriers in July 2020 to close Glengarry, Inshore, Marine and Centreside drives to vehicle traffic at the junction of The Quay and Quay 2 estates to temporarily re-create traffic conditions for residents in The Quay in place before development started in Quay 2.<\/p>\n<p>The decision sparked instant backlash from some estate residents and Intrapac.<\/p>\n<p>The shire originally planned to leave all roadblocks in place until the new intersection was complete, but announced in October 2020 new traffic data had led it to adopt a staged approach for their removal.<\/p>\n<p>In December 2020, councillors supported the officers\u2019 recommendation to carry out a new traffic study and modelling for Torquay North, but went beyond the proposal and resolved to also remove all three remaining barriers that month.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE long-awaited traffic lights at an intersection in Torquay North will not start construction until some point in the new year, according to the Surf Coast Shire. A fully signalised intersection at the junction of the Surf Coast Highway, Coombes Road and the extension of Rosser Boulevard has been part of the planning documents for [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":142,"featured_media":61283,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[7],"tags":[],"post_folder":[],"class_list":["post-61281","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Intersection works not given green light until 2022 - Surf Coast Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Intersection works not given green light until 2022 - Surf Coast Times\" \/>\n<meta property=\"og:description\" content=\"THE long-awaited traffic lights at an intersection in Torquay North will not start construction until some point in the new year, according to the Surf Coast Shire. A fully signalised intersection at the junction of the Surf Coast Highway, Coombes Road and the extension of Rosser Boulevard has been part of the planning documents for [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/\" \/>\n<meta property=\"og:site_name\" content=\"Surf Coast Times\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-27T17:00:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"James Taylor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"James Taylor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/\"},\"author\":{\"name\":\"James Taylor\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/c1765be3a722a2023e6ce64487db8b45\"},\"headline\":\"Intersection works not given green light until 2022\",\"datePublished\":\"2021-11-27T17:00:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/\"},\"wordCount\":387,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/11\\\/Untitled-design-6-2.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/\",\"name\":\"Intersection works not given green light until 2022 - Surf Coast Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/11\\\/Untitled-design-6-2.png\",\"datePublished\":\"2021-11-27T17:00:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/11\\\/Untitled-design-6-2.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2021\\\/11\\\/Untitled-design-6-2.png\",\"width\":1200,\"height\":630,\"caption\":\"The traffic lights will be installed here, at the intersection of Coombes Road (foreground), the Surf Coast Highway (left to right), and Rosser Boulevard (background). Photo: JAMES TAYLOR\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/news\\\/lights-intersection-delayed-2022\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Intersection works not given green light until 2022\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"name\":\"Surf Coast Times\",\"description\":\"Free local news\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#organization\",\"name\":\"Surf Coast Times\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/2\\\/2019\\\/08\\\/cropped-logo.png\",\"width\":350,\"height\":38,\"caption\":\"Surf Coast Times\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/#\\\/schema\\\/person\\\/c1765be3a722a2023e6ce64487db8b45\",\"name\":\"James Taylor\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/surfcoasttimes\\\/author\\\/james\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Intersection works not given green light until 2022 - Surf Coast Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/","og_locale":"en_US","og_type":"article","og_title":"Intersection works not given green light until 2022 - Surf Coast Times","og_description":"THE long-awaited traffic lights at an intersection in Torquay North will not start construction until some point in the new year, according to the Surf Coast Shire. A fully signalised intersection at the junction of the Surf Coast Highway, Coombes Road and the extension of Rosser Boulevard has been part of the planning documents for [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/","og_site_name":"Surf Coast Times","article_published_time":"2021-11-27T17:00:03+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png","type":"image\/png"}],"author":"James Taylor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"James Taylor","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/"},"author":{"name":"James Taylor","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/c1765be3a722a2023e6ce64487db8b45"},"headline":"Intersection works not given green light until 2022","datePublished":"2021-11-27T17:00:03+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/"},"wordCount":387,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png","articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/","name":"Intersection works not given green light until 2022 - Surf Coast Times","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png","datePublished":"2021-11-27T17:00:03+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2021\/11\/Untitled-design-6-2.png","width":1200,"height":630,"caption":"The traffic lights will be installed here, at the intersection of Coombes Road (foreground), the Surf Coast Highway (left to right), and Rosser Boulevard (background). Photo: JAMES TAYLOR"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/news\/lights-intersection-delayed-2022\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/"},{"@type":"ListItem","position":2,"name":"Intersection works not given green light until 2022"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#website","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","name":"Surf Coast Times","description":"Free local news","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#organization","name":"Surf Coast Times","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/2\/2019\/08\/cropped-logo.png","width":350,"height":38,"caption":"Surf Coast Times"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/#\/schema\/person\/c1765be3a722a2023e6ce64487db8b45","name":"James Taylor","url":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/author\/james\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/61281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/users\/142"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/comments?post=61281"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/posts\/61281\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media\/61283"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/media?parent=61281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/categories?post=61281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/tags?post=61281"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/surfcoasttimes\/wp-json\/wp\/v2\/post_folder?post=61281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}