	{"id":15994,"date":"2023-08-13T06:00:46","date_gmt":"2023-08-12T20:00:46","guid":{"rendered":"https:\/\/themooraboolnews.com.au\/?p=15994"},"modified":"2024-02-01T17:26:47","modified_gmt":"2024-02-01T06:26:47","slug":"frustration-over-link-road-delays","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/","title":{"rendered":"Frustration over link road delays"},"content":{"rendered":"<p class=\"01AuthorUnderline\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">By Lachlan Ellis<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">Moorabool Shire Council has asked the State Government to expedite plans for a new road in Bacchus Marsh, with the releasing of a preferred route well overdue.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">VicRoads first put forward four \u2018study areas\u2019 for the Eastern Link Road in May 2018, with the road to connect Gisborne Road and Bacchus Marsh-Geelong Road via the Western Freeway.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">The new road would divert freight vehicles from the town centre, which would bring some relief to traffic congestion in the area.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">Moorabool Shire Mayor Cr Rod Ward said the Eastern Link Road needed to be completed as soon as possible.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">\u201cAn eastern link option is needed as soon as possible to divert heavy vehicles and through traffic from the centre of town. This will ease congestion and improve safety. With Bacchus Marsh growing so rapidly, the town is busier than ever, so the sooner we address and ease the traffic congestion, the better,\u201d Cr Ward told the Moorabool News.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">\u201cFollowing the decision by the State Government not to proceed with the proposed Woolpack Road option in 2010, the residents of Bacchus Marsh have been waiting patiently for an alternate route to be identified. Regional Roads Victoria have done planning studies and identified options, but nothing has been announced.\u201d<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">Cr Ward said Council had first identified the need for an eastern link road in the late 1990s.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">\u201cWhen we first proposed the need for an alternative route through Bacchus Marsh, it was identified as a priority to: remove large, noisy B-double trucks from BM town centre, particularly Gisborne Rd &amp; Grant St, improve road safety on the Avenue and the Western Highway through a wider road for trucks and smoother interchanges, reduce traffic congestion and remove trucks from Bacchus Marsh town, improve access for business visitors and tourists, and connect with a future arterial road network,\u201d Cr Ward said.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">\u201cWe\u2019re calling on Regional Roads Victoria to release the preferred route, which should have happened months ago, so we can get closer to actually making the eastern link a reality.\u201d<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">The Victorian Department of Transport and Planning could not confirm a date for the preferred route\u2019s release.<\/span><\/p>\n<p class=\"01BodyCopy\" style=\"margin-bottom: 0cm\"><span lang=\"EN-GB\">For more information and to view the documents that Regional Roads Victoria has published so far on the Eastern Link Road, visit www.regionalroads.vic.gov.au and search \u2018Eastern Link Road\u2019.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Lachlan Ellis Moorabool Shire Council has asked the State Government to expedite plans for a new road in Bacchus Marsh, with the releasing of a preferred route well overdue. VicRoads first put forward four \u2018study areas\u2019 for the Eastern Link Road in May 2018, with the road to connect Gisborne Road and Bacchus Marsh-Geelong [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":221,"featured_media":23828,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[15],"tags":[2256,25,8478,33,8645],"post_folder":[],"class_list":["post-15994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bacchus-marsh-eastern-link-road","tag-by-lachlan-ellis","tag-mayor-cr-rod-ward","tag-moorabool-shire-council","tag-victorian-department-of-transport-and-planning"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Frustration over link road delays - The Moorabool News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Frustration over link road delays - The Moorabool News\" \/>\n<meta property=\"og:description\" content=\"By Lachlan Ellis Moorabool Shire Council has asked the State Government to expedite plans for a new road in Bacchus Marsh, with the releasing of a preferred route well overdue. VicRoads first put forward four \u2018study areas\u2019 for the Eastern Link Road in May 2018, with the road to connect Gisborne Road and Bacchus Marsh-Geelong [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/\" \/>\n<meta property=\"og:site_name\" content=\"The Moorabool News\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-12T20:00:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-01T06:26:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"905\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lachlan Ellis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lachlan Ellis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/\"},\"author\":{\"name\":\"Lachlan Ellis\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/person\\\/bfbc5a1c6baaf34dd181f21c64f18302\"},\"headline\":\"Frustration over link road delays\",\"datePublished\":\"2023-08-12T20:00:46+00:00\",\"dateModified\":\"2024-02-01T06:26:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/\"},\"wordCount\":393,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2023\\\/08\\\/plans-1-640x905-1.jpg\",\"keywords\":[\"bacchus marsh eastern link road\",\"By Lachlan Ellis\",\"Mayor Cr Rod Ward\",\"Moorabool Shire Council\",\"Victorian Department of Transport and Planning\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/\",\"name\":\"Frustration over link road delays - The Moorabool News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2023\\\/08\\\/plans-1-640x905-1.jpg\",\"datePublished\":\"2023-08-12T20:00:46+00:00\",\"dateModified\":\"2024-02-01T06:26:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2023\\\/08\\\/plans-1-640x905-1.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2023\\\/08\\\/plans-1-640x905-1.jpg\",\"width\":640,\"height\":905},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-over-link-road-delays\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Frustration over link road delays\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\",\"name\":\"The Moorabool News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\",\"name\":\"The Moorabool News\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/01\\\/MooraboolNews-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/01\\\/MooraboolNews-logo.png\",\"width\":1089,\"height\":400,\"caption\":\"The Moorabool News\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/person\\\/bfbc5a1c6baaf34dd181f21c64f18302\",\"name\":\"Lachlan Ellis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"caption\":\"Lachlan Ellis\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/author\\\/lachlanellis\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Frustration over link road delays - The Moorabool News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/","og_locale":"en_US","og_type":"article","og_title":"Frustration over link road delays - The Moorabool News","og_description":"By Lachlan Ellis Moorabool Shire Council has asked the State Government to expedite plans for a new road in Bacchus Marsh, with the releasing of a preferred route well overdue. VicRoads first put forward four \u2018study areas\u2019 for the Eastern Link Road in May 2018, with the road to connect Gisborne Road and Bacchus Marsh-Geelong [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/","og_site_name":"The Moorabool News","article_published_time":"2023-08-12T20:00:46+00:00","article_modified_time":"2024-02-01T06:26:47+00:00","og_image":[{"width":640,"height":905,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg","type":"image\/jpeg"}],"author":"Lachlan Ellis","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lachlan Ellis","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/"},"author":{"name":"Lachlan Ellis","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/person\/bfbc5a1c6baaf34dd181f21c64f18302"},"headline":"Frustration over link road delays","datePublished":"2023-08-12T20:00:46+00:00","dateModified":"2024-02-01T06:26:47+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/"},"wordCount":393,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg","keywords":["bacchus marsh eastern link road","By Lachlan Ellis","Mayor Cr Rod Ward","Moorabool Shire Council","Victorian Department of Transport and Planning"],"articleSection":["News"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/","name":"Frustration over link road delays - The Moorabool News","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg","datePublished":"2023-08-12T20:00:46+00:00","dateModified":"2024-02-01T06:26:47+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2023\/08\/plans-1-640x905-1.jpg","width":640,"height":905},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-over-link-road-delays\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/"},{"@type":"ListItem","position":2,"name":"Frustration over link road delays"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#website","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/","name":"The Moorabool News","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization","name":"The Moorabool News","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/01\/MooraboolNews-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/01\/MooraboolNews-logo.png","width":1089,"height":400,"caption":"The Moorabool News"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/person\/bfbc5a1c6baaf34dd181f21c64f18302","name":"Lachlan Ellis","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","caption":"Lachlan Ellis"},"url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/author\/lachlanellis\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts\/15994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/users\/221"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/comments?post=15994"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts\/15994\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/media\/23828"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/media?parent=15994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/categories?post=15994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/tags?post=15994"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/post_folder?post=15994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}