	{"id":27764,"date":"2024-03-17T04:02:51","date_gmt":"2024-03-16T17:02:51","guid":{"rendered":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/?p=27764"},"modified":"2024-03-17T09:23:09","modified_gmt":"2024-03-16T22:23:09","slug":"frustration-builds-over-crossing","status":"publish","type":"post","link":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/","title":{"rendered":"Frustration builds over crossing"},"content":{"rendered":"<p>AGED care residents have asked for a \u2018please explain\u2019 from Moorabool Shire Council, as their wait for a pedestrian crossing along a busy road nears the twelve-year mark.<\/p>\n<p>Providence Aged Care residents have been calling for a crossing across Griffith Street, which is often host to both industrial and school traffic, since 2012.<\/p>\n<p>In 2019, a petition was presented at a Council meeting, and a protest was also held outside Providence Village, with the ultimate goal of the protesters being the establishment of a lighted pedestrian crossing out the front of the village.<\/p>\n<p>And while improvements have been made on the street, including a bus stop and shelter built last year, the street still lacks the pedestrian crossing that Providence residents argue is essential for their safety.<\/p>\n<p>The 2019 petition organiser and Providence resident, Sylvia Merry, recently got in touch with the Moorabool News, expressing her frustration that the crossing was still not in place.<\/p>\n<p>\u201cIt\u2019s a never-ending story about our pedestrian crossing that\u2019s coming when Griffith Street gets widened, but in the meantime, we were told a pedestrian refuge would be erected in Griffith Street to help residents cross the road and use the newly erected bus stop,\u201d Ms Merry said.<\/p>\n<p>\u201cBut like the indoor swimming pool it\u2019s drawn up on paper, stuck in a drawer somewhere.\u201d<\/p>\n<p>Moorabool Shire Council CEO Derek Madden said a municipal review didn\u2019t recommend a pedestrian refuge, and a pedestrian crossing was still in the works.<\/p>\n<p>\u201cCouncil completed works in early 2023 that included a new bus stop, shelter, hardstand and pedestrian connection at this location,\u201d Mr Madden said,<\/p>\n<p>\u201cA refuge wasn\u2019t installed following review of the design and overall road safety considerations.<\/p>\n<p>\u201cCouncil is still planning for an upgrade of Griffith St that will include a formalised pedestrian crossing point at this location.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AGED care residents have asked for a \u2018please explain\u2019 from Moorabool Shire Council, as their wait for a pedestrian crossing along a busy road nears the twelve-year mark. Providence Aged Care residents have been calling for a crossing across Griffith Street, which is often host to both industrial and school traffic, since 2012. In 2019, [&#8230;]<\/p>\n<p><a class=\"btn btn-secondary understrap-read-more-link\" href=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":221,"featured_media":27765,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[15],"tags":[],"post_folder":[],"class_list":["post-27764","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Frustration builds over crossing - The Moorabool News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Frustration builds over crossing - The Moorabool News\" \/>\n<meta property=\"og:description\" content=\"AGED care residents have asked for a \u2018please explain\u2019 from Moorabool Shire Council, as their wait for a pedestrian crossing along a busy road nears the twelve-year mark. Providence Aged Care residents have been calling for a crossing across Griffith Street, which is often host to both industrial and school traffic, since 2012. In 2019, [...]Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/\" \/>\n<meta property=\"og:site_name\" content=\"The Moorabool News\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-16T17:02:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-16T22:23:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lachlan Ellis\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lachlan Ellis\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/\"},\"author\":{\"name\":\"Lachlan Ellis\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/person\\\/bfbc5a1c6baaf34dd181f21c64f18302\"},\"headline\":\"Frustration builds over crossing\",\"datePublished\":\"2024-03-16T17:02:51+00:00\",\"dateModified\":\"2024-03-16T22:23:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/\"},\"wordCount\":305,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/03\\\/IMG_5732-scaled-e1710627767335.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/\",\"name\":\"Frustration builds over crossing - The Moorabool News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/03\\\/IMG_5732-scaled-e1710627767335.jpg\",\"datePublished\":\"2024-03-16T17:02:51+00:00\",\"dateModified\":\"2024-03-16T22:23:09+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/03\\\/IMG_5732-scaled-e1710627767335.jpg\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/03\\\/IMG_5732-scaled-e1710627767335.jpg\",\"width\":1200,\"height\":630,\"caption\":\"Cross over waiting: Providence residents have been campaigning for a pedestrian crossing at Griffith Street since 2012. Photo: LACHLAN ELLIS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/news\\\/frustration-builds-over-crossing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Frustration builds over crossing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#website\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\",\"name\":\"The Moorabool News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#organization\",\"name\":\"The Moorabool News\",\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/01\\\/MooraboolNews-logo.png\",\"contentUrl\":\"https:\\\/\\\/static.timesnewsgroup.com.au\\\/prod\\\/uploads\\\/sites\\\/28\\\/2024\\\/01\\\/MooraboolNews-logo.png\",\"width\":1089,\"height\":400,\"caption\":\"The Moorabool News\"},\"image\":{\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/#\\\/schema\\\/person\\\/bfbc5a1c6baaf34dd181f21c64f18302\",\"name\":\"Lachlan Ellis\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g\",\"caption\":\"Lachlan Ellis\"},\"url\":\"https:\\\/\\\/timesnewsgroup.com.au\\\/themooraboolnews\\\/author\\\/lachlanellis\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Frustration builds over crossing - The Moorabool News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/","og_locale":"en_US","og_type":"article","og_title":"Frustration builds over crossing - The Moorabool News","og_description":"AGED care residents have asked for a \u2018please explain\u2019 from Moorabool Shire Council, as their wait for a pedestrian crossing along a busy road nears the twelve-year mark. Providence Aged Care residents have been calling for a crossing across Griffith Street, which is often host to both industrial and school traffic, since 2012. In 2019, [...]Read More...","og_url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/","og_site_name":"The Moorabool News","article_published_time":"2024-03-16T17:02:51+00:00","article_modified_time":"2024-03-16T22:23:09+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg","type":"image\/jpeg"}],"author":"Lachlan Ellis","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lachlan Ellis","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#article","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/"},"author":{"name":"Lachlan Ellis","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/person\/bfbc5a1c6baaf34dd181f21c64f18302"},"headline":"Frustration builds over crossing","datePublished":"2024-03-16T17:02:51+00:00","dateModified":"2024-03-16T22:23:09+00:00","mainEntityOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/"},"wordCount":305,"commentCount":0,"publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg","articleSection":["News"],"inLanguage":"en-AU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/","name":"Frustration builds over crossing - The Moorabool News","isPartOf":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#website"},"primaryImageOfPage":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#primaryimage"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#primaryimage"},"thumbnailUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg","datePublished":"2024-03-16T17:02:51+00:00","dateModified":"2024-03-16T22:23:09+00:00","breadcrumb":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#primaryimage","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/03\/IMG_5732-scaled-e1710627767335.jpg","width":1200,"height":630,"caption":"Cross over waiting: Providence residents have been campaigning for a pedestrian crossing at Griffith Street since 2012. Photo: LACHLAN ELLIS"},{"@type":"BreadcrumbList","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/news\/frustration-builds-over-crossing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/"},{"@type":"ListItem","position":2,"name":"Frustration builds over crossing"}]},{"@type":"WebSite","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#website","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/","name":"The Moorabool News","description":"","publisher":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#organization","name":"The Moorabool News","url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/logo\/image\/","url":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/01\/MooraboolNews-logo.png","contentUrl":"https:\/\/static.timesnewsgroup.com.au\/prod\/uploads\/sites\/28\/2024\/01\/MooraboolNews-logo.png","width":1089,"height":400,"caption":"The Moorabool News"},"image":{"@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/#\/schema\/person\/bfbc5a1c6baaf34dd181f21c64f18302","name":"Lachlan Ellis","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4b8766ff6263c9ffb6ec80f89efea9b7a992bc23f7fd86445d569b0e6b510f3e?s=96&d=mm&r=g","caption":"Lachlan Ellis"},"url":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/author\/lachlanellis\/"}]}},"_links":{"self":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts\/27764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/users\/221"}],"replies":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/comments?post=27764"}],"version-history":[{"count":0,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/posts\/27764\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/media\/27765"}],"wp:attachment":[{"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/media?parent=27764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/categories?post=27764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/tags?post=27764"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/timesnewsgroup.com.au\/themooraboolnews\/wp-json\/wp\/v2\/post_folder?post=27764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}